Preparatory work for Gifu Station of the Central Linear Railway to begin July, aiming for completion in spring 2025.
.
2021-07-17_Gifu_station_aera_aerial
2021-07-17_Gifu_station_aera_aerial
The area where the Gifu station of the Central Linear Railway will be built.
Photo from https://www.gifu-np.co.jp/news/20210715 ... 87641.html

On April 15, JR Central, which is constructing the Central Linear Railway (Shinkansen), announced that it will begin preparatory work on the east part of the station in Nakatsugawa City, Gifu Prefecture, within July. The station is expected to be completed in the spring of 2025.

 According to JR Tokai, the overall area of the station construction is about 1.3 km, and this time the eastern part of the station, which is divided into three sections, will be constructed. The section is about 290 meters long, and will include the construction of entrances and exits, felling of trees, and the creation of a construction yard. The construction of an elevated bridge and the replacement of roads and rivers will also be carried out.

 An environmental conservation plan has been submitted to the prefecture and the city. The date for the start of full-scale construction, including the groundbreaking ceremony for the Gifu station, has not yet been decided.


Info based on https://www.gifu-np.co.jp/news/20210715 ... 87641.html
Accessed: July 17, 2021
頻繁に日本で、頻繁にヨーロッパで。ツイッターはたまに。フェイスブックやWhatsappは使わない。

User avatar
Miss Maglev
Posts: 371
Joined: 23. Apr 2021, 13:30

Re: Preparatory work for Gifu Maglev Station

Unread post by Miss Maglev »

 新駅は高架駅で幅約45メートル、高さは約30メートル。新駅の全3工区(約1・3キロ)のうち駅東部(約290メートル区間)について、環境保全措置などの計画を15日、県と中津川市に提出した。ほかの2工区も今秋に同様の計画を提出し、着工をめざす。
Source: https://www.asahi.com/articles/ASP7J6S72P7HOHGB00G.html Accessed July 17, 2021

Translation: The new station will be an elevated station, about 45 meters wide and 30 meters high. Of the three sections (about 1.3 km) of the new station, the plan for the eastern section (about 290 meters) was submitted to the prefectural government and Nakatsugawa City on April 15. Similar plans for the other two construction zones will be submitted this fall, with the aim of starting construction.