Page 1 of 1

Power transmission

Posted: 31. Oct 2023, 05:55
by Parrahub1
As the farmers do not want power lines across their paddocks in Australia could the power made by Snowy 2 be transmitted via the Sydney to Melbourne Japanese SC maglev

PS
I found out that there is 100% p/a profit using HVDC cables in the Sydney to Melbourne tunnel so now you have $2b p/a from overnight containertrains, $2b p/a from daytime trains and a huge 12b p/a from HVDC cables.

So without the surface problems it will balance our trade with China, remove all trucks and planes between these cities and make a profit in only three years.

Re: Power transmission

Posted: 15. Feb 2024, 05:18
by Parrahub1
I would like to add that the HVDC cables in the tunnel would not be blown down like happened yesterday to the Victorian power transmission above ground.