[JP] Maglev Operating System (VOS)

User avatar
maglev
Site Admin
Posts: 18
Joined: 3. Apr 2021, 13:14

[JP] Maglev Operating System (VOS)

Unread post by maglev »

Central Japan Railway Company (JR Central) has adopted an agile, in-house development approach for its superconducting maglev (SCMAGLEV) train operation system (VOS). This initiative aims to enhance the efficiency and safety of the SCMAGLEV, a next-generation high-speed rail technology.​

Traditionally, JR Central relied on external vendors for system development. However, recognizing the need for greater flexibility and rapid iteration, the company has shifted to an agile VOS methodology. This approach allows for continuous feedback and improvements, ensuring the VOS can adapt to evolving requirements and technologies.​

The new operation system is designed to manage various aspects of SCMAGLEV operations, including train scheduling, maintenance, and real-time monitoring. By developing the system internally, JR Central aims to foster closer collaboration between engineers and operational staff, leading to more tailored solutions.​
.
2025-04-14_enterprisezine.jp
2025-04-14_enterprisezine.jp
21828_1[1].png (151.3 KiB) Viewed 1130 times
. Source: https://ez-cdn.shoeisha.jp/static/image ... 1828_1.png Accessed 2025-04-14

Translation of Japanese Text:
Data-Driven System
Top Elements:
Vast Time-Series Data (from the train)
Central Data Types (in circles):
Vehicle Data
Inspection/Maintenance Data
Operational Data
Business Data (e.g., materials, qualifications)
Functional Areas (in black boxes):
Work Planning Function
Condition Monitoring Function
Equipment Management Function
Additional Notes:
Data flows between all areas, centered around a data-driven approach.
.
2025-04-14_enterprisezine.jp_translated
2025-04-14_enterprisezine.jp_translated
.
Partial translation ot the Japanese Graph.

A partial rollout of the VOS is planned for this summer on the Yamanashi Maglev Test Line. This pilot will test core functionalities and gather data to inform further development. The insights gained will be crucial for refining the system ahead of full-scale deployment.​

JR Central's move reflects a broader trend in the transportation industry toward agile development and digital transformation. By bringing system development in-house, the company seeks to accelerate innovation and maintain a competitive edge in high-speed rail technology.​

The SCMAGLEV project represents a significant investment in the future of transportation, with the potential to revolutionize travel through unprecedented speeds and efficiency. JR Central's agile approach to system development is a strategic step toward realizing this vision.​

.
2025-04-14_enterprisezine_2.jp
2025-04-14_enterprisezine_2.jp
21828_2[1].png (140.61 KiB) Viewed 1130 times
. Source: https://ez-cdn.shoeisha.jp/static/image ... 1828_2.png Accessed 2025-04-14

.
2025-04-14_enterprisezine_2.jp_translated
2025-04-14_enterprisezine_2.jp_translated

Partial translation ot the Japanese Graph.


Info based on https://enterprisezine.jp/news/detail/21828 Accessed 2025-04-14

Post Reply