. https://www.kiratas.com/2023/12/08/magn ... has-plans/ Accessed: 2023-12-10
.
https://www.kiratas.com/2023/12/08/magn ... has-plans/ Accessed: 2023-12-10After Berlin, Nuremberg also wants to go high: the construction of a magnetic levitation train is now being discussed for the 518,000-inhabitant city in Bavaria. Bavaria’s Prime Minister Markus Söder (CSU) got the ball rolling or the train floating. In a government speech, he stated that such an option would be examined for Nuremberg. As in the federal capital, the Transport System Bögl (TSB) should be considered for this purpose, which in the case of Nuremberg has its headquarters not far from the city.
[...]
However, the Nuremberg suspension railway plans are still in their early stages. Currently there is only a rough idea of where the route could run. It is intended to connect the future Technical University (UTN), the exhibition center and the southern hospital in the south of the city – at a certain distance from the city center and the main train station. “The extent to which the stadium area, for which developments are currently planned, will be included will be revealed during the audit,” explained city spokesman Michael Ruf when asked by heise online.