Search found 332 matches
- 27. Aug 2025, 21:49
- Forum: Websites, Web & Publications
- Topic: [US] Baltimore - Washington Maglev: Call for support
- Replies: 6
- Views: 16940
[US] Baltimore - Washington high-speed maglev train project is not happening
Maryland’s high-speed maglev train project is not happening Baltimore Washington Rapid Rail is the company that had been slated to develop the project labeled Northeast Maglev. It said the train would have connected Washington, D.C., to Baltimore in 15 minutes at a speed of 311 mile per hour; and a...
- 27. Aug 2025, 21:45
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] Shizuoka Governor, Oi River Mayors Align on Maglev Compensation Policy
静岡知事と大井川流域首長、リニア工事後の補償担保方針で一致 Shizuoka Governor, Oi River Mayors Align on Maglev Compensation Policy Shizuoka Governor Yasutomo Suzuki and mayors from the Oi River basin met on August 27 to discuss the Chuo Shinkansen maglev project. The talks focused on compensation policies in the event of unfore...
- 24. Aug 2025, 21:54
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] The Shizuoka discussions are finally advancing
In Shizuoka Prefecture, where construction hasn’t yet begun, discussions are finally advancing. On August 1, JR Central requested to begin preparatory work (such as office setup and land development), which was previously blocked by former Governor Kawakatsu. Current Governor Suzuki remains cautious...
- 24. Aug 2025, 21:49
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Maglev Bridge Construction Progressing in Yamanashi Prefecture
- Replies: 0
- Views: 1988
[JP] Maglev Bridge Construction Progressing in Yamanashi Prefecture
Bridge Construction Progressing in Yamanashi Prefecture JR Central recently opened up construction sites in Yamanashi Prefecture to the media, showcasing progress on two major river-spanning bridges for the Linear Chuo Shinkansen: the Kamunashi River Bridge (754m, the longest on the Shinagawa–Nagoy...
- 21. Aug 2025, 14:33
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central to Begin Ravine Surveys in September
【リニア】JR東海が9月から沢上流域の調査へ 静岡県の専門部会で報告 県が求める15の沢が対象 JR Central to Begin Ravine Surveys in September – Reported at Shizuoka Prefecture Expert Committee JR Central told Shizuoka Prefecture’s expert committee that it will start surveys in upstream ravine areas in September. The prefecture requested invest...
- 21. Aug 2025, 11:32
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
Re: [JP] Government urged to complete Maglev construction as soon as possible
リニア早期整備へ総会決議 愛知の期成同盟会 General Meeting Resolution for Early Construction of Linear Central Shinkansen Aichi Maglev Promotion League The Promotion Alliance, organized by local governments and the business community in Aichi Prefecture to promote the construction of the Linear Central Shinkansen, held...
- 20. Aug 2025, 12:53
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Compensation Measures for Ecosystem Impact of Maglev Construction
- Replies: 0
- Views: 2070
[JP] Compensation Measures for Ecosystem Impact of Maglev Construction
“リニア工事の生態系影響”JR東海が代償措置で新たな考え JR Central Presents New Compensation Measures for Ecosystem Impact of Maglev Construction On August 20, JR Central introduced a new approach to address potential ecological impacts from tunnel construction for the Chuo Shinkansen (Maglev) project in the Southern Alps. I...
- 19. Aug 2025, 21:46
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes
- Replies: 3
- Views: 57492
[JP] Shizuoka Signals Shift on Linear Maglev Work After Five-Year Dispute
Shizuoka Signals Shift on Linear Maglev Work After Five-Year Dispute The analysis of the dispute and its background was first detailed in a commentary by journalist Kazuya Kobayashi in PRESIDENT Online (https://news.nifty.com/article/magazine/12179-4404770/ Accessed 2025-08-19) . Kobayashi noted th...
- 18. Aug 2025, 13:47
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes
- Replies: 3
- Views: 57492
Re: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes
Will the Long-Awaited Maglev Arrive in 10 Years? Population Growth and a Future Tourism Hub for Mt. Fuji—Yamanashi Still Without an Airport or Shinkansen Station . Progress on both the Chuo Shinkansen maglev line and the Hokkaido Shinkansen has stalled, and the Hokuriku Shinkansen extension to Shin...
- 17. Aug 2025, 17:58
- Forum: ASIA
- Topic: [PH] Maglev for the Philippines?
- Replies: 1
- Views: 65558
[PH] [KR] Langkawi Maglev Project Halted Following Withdrawal of Korean Partner
Langkawi Maglev Project Halted Following Withdrawal of Korean Partner The proposed high-speed magnetic levitation (maglev) rail project in Langkawi has been suspended following the withdrawal of the Korean investor involved in the initiative. According to Haim Hilman Abdullah, Kedah State Executive...
- 17. Aug 2025, 13:02
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: Arsenic substances in soil in Gifu 2.1 times the environmental standard
- Replies: 16
- Views: 77715
[JP] Chemical Injection Abandoned in Gifu Tunnel Project Over Groundwater and Structural Concerns
Discontinuation of Chemical Grouting to Control Groundwater Inflow at Gifu Linear Chuo Shinkansen Tunnel Construction Site On June 3, 2025, Central Japan Railway Company (JR Central) announced the cessation of chemical grouting operations intended to reduce groundwater inflow within the Linear Chuo...
- 13. Aug 2025, 22:58
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central Seeks Understanding for Worksite Expansion at Water Resource Conference
JR Central Seeks Understanding for Worksite Expansion at Water Resource Conference . Screenshot 2025-08-13 225643.jpg Photo: Screenshot from https://www.yomiuri.co.jp/local/shizuoka/news/20250813-OYTNT50177/ Accessed: August 13, 2025 . On August 13, the Oigawa Water Resource Related Council meeting...
- 13. Aug 2025, 17:22
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central Explains Water Outflow Measures for Linear Construction in Shizuoka to Local Authorities
JR Central Explains Water Outflow Measures for Linear Construction in Shizuoka to Local Authorities On August 13, the Oi River Water Resource Liaison Council—comprising Shizuoka Prefecture and municipalities along the Oi River—held its first meeting in two and a half months in Fujieda City to discu...
- 7. Aug 2025, 10:09
- Forum: Fundamental issues relating to mobility, transport and Maglev
- Topic: [CN] Maglev train researchers may have solved ‘tunnel boom’ shock waves
- Replies: 1
- Views: 22105
[CN] Maglev train researchers may have solved ‘tunnel boom’ shock waves
Maglev train researchers may have solved ‘tunnel boom’ shock waves Soundproofing buffers to be deployed on China’s latest maglev prototype Chinese researchers may have resolved the long-standing “tunnel boom” issue as the country prepares to introduce its newest high-speed maglev train prototype. C...
- 4. Aug 2025, 22:19
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
- Replies: 4
- Views: 63656
[JP] Exemption from Embankment Regulations?
Exemption from Embankment Regulations for Linear Waste Disposal Site, Shizuoka Prefecture's Initial Recognition in Expert Subcommittee On August 4, a subcommittee in Shizuoka Prefecture, discussing the impact of the Southern Alps tunnel construction for the Linear Chuo Shinkansen on the water resou...
- 4. Aug 2025, 22:15
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
- Replies: 4
- Views: 63656
[JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
Exemption from Embankment Regulations for Linear Waste Disposal Site, Shizuoka Prefecture's Initial Recognition in Expert Subcommittee On August 4, a subcommittee in Shizuoka Prefecture, discussing the impact of the Southern Alps tunnel construction for the Linear Chuo Shinkansen on the water resour...
- 4. Aug 2025, 13:02
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site
- Replies: 2
- Views: 56587
[JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site
. On July 17, at the construction site of the Linear Chuo Shinkansen’s South Alps Tunnel in Hayakawa Town, contaminated water overflowed from a storage tank and leaked into a nearby river. The tank had been collecting rainwater that came into contact with excavated soil. An estimated 7 cubic meters ...
- 2. Aug 2025, 22:02
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] Trump administration cancels Maglev funding
- Replies: 3
- Views: 13172
Re: [US] Trump administration cancels Maglev funding
Baltimore Washington Rapid Rail is the company that had been slated to develop the project labeled Northeast Maglev. It said the train would have connected Washington, D.C., to Baltimore in 15 minutes at a speed of 311 mile per hour; and a trip between Washington and New York in an hour. The compan...
- 2. Aug 2025, 12:07
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] Request for approval for land development
On August 1, JR Central Vice President Takanori Mizuno visited the Shizuoka Prefectural Office to request approval for land development of work yards (construction bases) related to the Linear Chuo Shinkansen project. Vice Governor Sho Hiraki showed a willingness to discuss the matter, signaling pot...
- 2. Aug 2025, 11:55
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central Requests Approval to Expand Base for Linear Tunnel Survey Work
リニアのトンネル工事 拠点拡張へ JR東海が静岡県に許可を求めるJ R Central Requests Approval to Expand Base for Linear Tunnel Survey Work JR Central has asked Shizuoka Prefecture for permission to expand facilities needed for environmental surveys related to the Linear maglev tunnel project. Before construction, land is being pr...
- 1. Aug 2025, 21:44
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] Trump administration cancels Maglev funding
- Replies: 3
- Views: 13172
Re: [US] Trump administration cancels Maglev funding
While its project is tabled for now, the Northeast Maglev spokesperson said: “It is our sincere hope that future leaders will recognize the promise of high-speed rail, the adoption of new technology, and the opportunity to reclaim America’s transportation dominance to the benefit of its citizens.” ...
- 28. Jul 2025, 12:29
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
Re: [JP] The Shizuoka Water & Maglev Tunnel Problem
On July 27, JR Central (JR Tokai) held a closed-door meeting with local governments along the Ōi River basin in Shizuoka Prefecture to discuss ongoing concerns about the Linear (maglev) Shinkansen construction. The company announced plans to hold additional community information sessions from this f...
- 28. Jul 2025, 12:11
- Forum: PR China and Taiwan
- Topic: [CN] China Accelerates Maglev Innovation Ahead of Major Industry Milestones
- Replies: 1
- Views: 28689
[CN] China Accelerates Maglev Innovation Ahead of Major Industry Milestones
Китай демонстрирует прогресс в области маглев-технологий на фоне подготовки к отраслевым событиям China is accelerating its development of maglev (magnetic levitation) technology in preparation for upcoming industry milestones. The state-owned CRRC is advancing a high-speed maglev train capable of ...
- 26. Jul 2025, 19:43
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Chuo Shinkansen at a Crossroads: Kansai Urged to Decide Route
- Replies: 1
- Views: 45725
[JP] Chuo Shinkansen at a Crossroads: Kansai Urged to Decide Route
Maglev Momentum: Furuya Pushes for Fast-Track Decisions on Chuo Shinkansen Keiji Furuya, former National Public Safety Commission Chairman and head of the LDP’s maglev committee, underscored the strategic significance of the Chuo Shinkansen maglev project. He highlighted two primary objectives: str...
- 20. Jul 2025, 22:35
- Forum: Fundamental issues relating to mobility, transport and Maglev
- Topic: [CN] China massively overbuilt high-speed rail ?
- Replies: 1
- Views: 84577
[CN] China massively overbuilt high-speed rail ?
China massively overbuilt high-speed rail ? Lu Dadao of the Chinese Academy of Sciences warns that oversized, underused HSR infrastructure has ignored basic economic logic, weakened public finances, and derailed regional planning. Lu Dadao, a prominent economic geographer at the Chinese Academy of ...
- 19. Jul 2025, 20:46
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site
- Replies: 2
- Views: 56587
[JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site
7,000 Liters of Contaminated Water Leak from Maglev Construction Site in Yamanashi Authorities Launch Water Quality Investigation After Chromium Detected Yamanashi Prefecture officials have confirmed that approximately 7,000 liters of contaminated water spilled from a Linear Chuo Shinkansen constru...
- 19. Jul 2025, 20:40
- Forum: Other fields of application for Maglev technologies
- Topic: [US] Electromagnetic Launcher
- Replies: 0
- Views: 110102
[US] Electromagnetic Launcher
Auriga Space announces new funding for its electromagnetic launcher Auriga Space boosts payloads to rocket-free hypersonic speeds using linear electric motor technology. Auriga Space, a California-based startup, has secured **\$6 million** in new funding led by OTB Ventures, with participation from...
- 14. Jul 2025, 12:42
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
[JP] Gifu Prefecture Alliance Pushes for Early Opening of Maglev Shinkansen
Gifu Prefecture Alliance Pushes for Early Opening of Maglev Shinkansen On July 14, the Gifu Prefectural Promotion Alliance held its annual general meeting in Tajimi City to discuss the construction of the Chuo Shinkansen maglev line. Gifu Governor Yoshihide Ezaki, who chairs the alliance, emphasize...
- 11. Jul 2025, 18:39
- Forum: General maglev debate in China
- Topic: [CN] ... ultra-high-speed maglev train development
- Replies: 4
- Views: 81117
[CN] China Unveils 600 km/h Maglev Prototype, Pushing the Boundaries of High-Speed Rail
China Unveils 600 km/h Maglev Prototype, Pushing the Boundaries of High-Speed Rail b37ce3b7-b865-4606-8b1b-16f65a0bd54e_ee7496b2[1].jpg Source: https://cdn.i-scmp.com/sites/default/files/styles/1200x800/public/d8/images/canvas/2025/07/11/b37ce3b7-b865-4606-8b1b-16f65a0bd54e_ee7496b2.jpg?itok=MKcSDP...
- 11. Jul 2025, 15:29
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: Arsenic substances in soil in Gifu 2.1 times the environmental standard
- Replies: 16
- Views: 77715
[JP] Gifu Prefecture Urges Environmental Consideration
Gifu Prefecture Urges Environmental Consideration for Linear Chuo Shinkansen Construction Waste Site On July 10, Gifu Prefecture submitted an official opinion letter to JR Central (JR Tokai), requesting greater environmental and community considerations regarding the company’s plan to construct a s...
- 7. Jul 2025, 12:45
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Maglev: 31 of 84 Sections Miss 2027 Target
- Replies: 0
- Views: 102810
[JP] Maglev: 31 of 84 Sections Miss 2027 Target
Why JR Central’s Maglev Construction Is Delayed Beyond Shizuoka: 31 of 84 Sections Miss 2027 Target JR Central has confirmed that 31 of 84 construction sections on the Shinagawa–Nagoya maglev line will not meet the original 2027 opening goal. While delays in Shizuoka forced an early revision of tha...
- 6. Jul 2025, 20:18
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagoya Maglev Station
- Replies: 12
- Views: 72851
[JP] Nagoya Maglev Station --> Kameyama
“Only Kameyama Offers 20-Minute Access to Two Major Metropolitan Areas” — Professor Eguchi of Nagoya Gakuin University Gives Lecture on the Maglev Project On July 1, the Kameyama Citizens' Council for the Promotion of the Maglev Chuo Shinkansen and JR Double-Track Electrification held its general m...
- 4. Jul 2025, 16:05
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] Linear Maglev’s “Shizuoka Water Issue” Resolved?
Linear Maglev’s “Shizuoka Water Issue” Resolved, but Challenges Remain — 7 Ongoing Tunnel Construction Troubles The most critical issue surrounding the construction of the Linear Chuo Shinkansen—the “water issue” in the Shizuoka section—has been resolved. In June 2025, discussions between Shizuoka ...
- 3. Jul 2025, 18:59
- Forum: Other fields of application for Maglev technologies
- Topic: [US] XTI Aerospace Collaborates with MagLev Aero
- Replies: 0
- Views: 121802
[US] XTI Aerospace Collaborates with MagLev Aero
XTI Aerospace Collaborates with MagLev Aero on Transformational Electric Propulsion System Englewood, CO & Boston, MA – July 3, 2025 – XTI Aerospace, Inc. (NASDAQ: XTIA), an emerging leader in advanced hybrid-electric vertical takeoff and landing (xVTOL) aircraft, today announced a strategic co...
- 30. Jun 2025, 15:16
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Tohoku University to Enhance Aerodynamic Performance of Maglev
- Replies: 2
- Views: 57068
[JP] Tohoku University to Enhance Aerodynamic Performance of Maglev
Tohoku University and JR Central Launch Joint Research Using Supercomputer “Fugaku” to Enhance Aerodynamic Performance of Maglev Tohoku University and Central Japan Railway Company (JR Central) announced on June 26 that they have begun joint research aimed at improving the aerodynamic performance o...
- 28. Jun 2025, 12:41
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
[JP] JR Central Halts Groundwater Countermeasures
JR Central Halts Groundwater Countermeasures for Maglev Tunnel Due to Risk of Tunnel Damage JR Central has announced it will halt ongoing groundwater countermeasures at the construction site of the Chuo Shinkansen (Maglev) tunnel in Mizunami City, Gifu Prefecture. The decision comes amid concerns t...
- 19. Jun 2025, 22:34
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Ko-shibu River Bridge
- Replies: 1
- Views: 57282
[JP] Ko-shibu River Bridge
The Japan Central Railway (JR Tokai) announced that construction on a bridge for the Linear Chūō Shinkansen, which will span the Ko-shibu River in Ōshika Village, will begin in the fall of 2025. The project aims to complete the bridge by June 2030. A briefing on the project was held on the evening o...
- 16. Jun 2025, 22:06
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
[JP]Yamanashi Construction Industry Federation Confirms Continued Lobbying for Maglev-Related Contracts
Yamanashi Construction Industry Federation Confirms Continued Lobbying for Linear Shinkansen-Related Contracts The General Assembly of the Yamanashi Prefecture Construction Industry Federation, composed of various construction-related organizations in the prefecture, was held to confirm this fiscal ...
- 14. Jun 2025, 13:44
- Forum: Other fields of application for Maglev technologies
- Topic: Can maglev reduce downtime of manufacturing transport systems?
- Replies: 1
- Views: 59075
Can maglev reduce downtime of manufacturing transport systems?
Can maglev reduce downtime of manufacturing transport systems? Magnetic levitation (maglev) technology offers a compelling alternative to traditional manufacturing transport systems that rely on mechanical bearings and rollers. These conventional systems suffer from friction-induced wear, leading t...
- 13. Jun 2025, 15:41
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
[JP] Nagano – Iida City to Independently Investigate Rivers Near Maglev Construction Soil Site
Nagano – Iida City to Independently Investigate Rivers Near Linear Shinkansen Construction Soil Site In response to the start of deliveries this week of excavated soil containing naturally occurring heavy metals exceeding regulatory limits to a Linear Chuo Shinkansen construction site in Iida City,...
- 11. Jun 2025, 11:51
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] "Even the Boars Are Gone": The Drying Waters and Local Anger Over the Maglev Construction
- Replies: 6
- Views: 70515
[JP] JR Central to Secure Alternative Water Sources
Depletion of Wells Due to Linear Construction – JR Central President: "We Will Work to Secure Alternative Water Sources" Regarding the issue of water gushing out at the Linear Chuo Shinkansen construction site in Gifu Prefecture, which has led to the depletion of nearby wells, JR Central ...
- 9. Jun 2025, 14:25
- Forum: Fundamental issues relating to mobility, transport and Maglev
- Topic: [JP] Rainfall Simulator
- Replies: 0
- Views: 105900
[JP] Rainfall Simulator
“Up to 200 mm/hour rain possible…” JR Central’s facility pioneers torrential rain and ride-comfort research . Screenshot 2025-06-09 142347.jpg . Photo: https://www.fnn.jp/articles/-/884332 Accessed on 2025-06-09 (Screenshot) JR Central’s test site in Komaki, Aichi, replicates a full-scale 6 m emban...
- 9. Jun 2025, 14:08
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
Re: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
In response to concerns about the use of excavated soil containing naturally occurring heavy metals exceeding regulatory limits, the city of Iida, Nagano Prefecture, has signed an agreement with JR Central regarding environmental safety related to the Chuo Shinkansen construction. The soil in questi...
- 5. Jun 2025, 16:45
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] New Linear Maglev Station in Hashimoto Becomes a Public Attraction
- Replies: 4
- Views: 67402
[JP] Maglev Construction Site in Sagamihara Opens to Public as Equipment for Tunnel Boring Machine Arrives
Maglev Construction Site in Sagamihara Opens to Public as Equipment for Tunnel Boring Machine Arrives . K10014826821_2506051756_0605180238_01_02[1].jpg . Photo: https://www3.nhk.or.jp/news/html/20250605/k10014826821000.html June 5, 2025 At the future site of the Chuo Shinkansen’s new station in Sag...
- 5. Jun 2025, 09:42
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] JR Central Launches Full-Scale Maglev Tunnel Excavation in Aichi’s Kasugai City
- Replies: 1
- Views: 55682
Re: [JP] JR Central Launches Full-Scale Maglev Tunnel Excavation in Aichi’s Kasugai City
坂下西工区(愛知県春日井市)のトンネル内。
. .
Inside the Sakashita West construction area (Kasugai City, Aichi Prefecture) tunnel. Shield tunneling work has begun.
Photo source: https://newswitch.jp/image/45917 Accessed 2025-06-05
. .
Inside the Sakashita West construction area (Kasugai City, Aichi Prefecture) tunnel. Shield tunneling work has begun.
Photo source: https://newswitch.jp/image/45917 Accessed 2025-06-05
- 3. Jun 2025, 20:34
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] "Even the Boars Are Gone": The Drying Waters and Local Anger Over the Maglev Construction
- Replies: 6
- Views: 70515
[JP] JR Central Halts Chemical Grouting at Maglev Tunnel Site in Mizunami, Gifu Over Groundwater Concerns
JR Central Halts Chemical Grouting at Maglev Tunnel Site in Mizunami, Gifu Over Groundwater Concerns JR Central announced on June 3 that it will halt chemical grouting measures at the Chuo Shinkansen maglev tunnel construction site in Mizunami City, Gifu Prefecture, where groundwater levels have dr...
- 2. Jun 2025, 12:21
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] JR Central Launches Full-Scale Maglev Tunnel Excavation in Aichi’s Kasugai City
- Replies: 1
- Views: 55682
[JP] JR Central Launches Full-Scale Maglev Tunnel Excavation in Aichi’s Kasugai City
JR Central held a launch ceremony on June 2 for a tunnel boring machine (TBM) at the Sakashita Emergency Exit construction site in Kasugai City, Aichi Prefecture. This marks the start of full-scale excavation on the Chuo Shinkansen maglev line's "Sakashita West Section" tunnel, heading sou...
- 1. Jun 2025, 22:13
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
Re: [JP] Government urged to complete Maglev construction as soon as possible
An article from the Chunichi Shimbun, dated May 28, 2025, reports on the general meeting of the Maglev Construction Promotion Alliance held in Tokyo. The alliance, comprising prefectures along the Chuo Shinkansen route, adopted a resolution urging the early commencement of construction in Shizuoka P...
- 29. May 2025, 00:40
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
- 29. May 2025, 00:28
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Government urged to complete Maglev construction as soon as possible
- Replies: 32
- Views: 140419
[JP] Maglev Construction Alliance Calls for Early Start and Clear Opening Date
Maglev Construction Alliance Calls for Early Start and Clear Opening Date The “Maglev Construction Promotion Alliance,” made up of prefectures along the Chuo Shinkansen route, held its annual general meeting in Chiyoda, Tokyo. The group adopted a resolution urging early construction in Shizuoka Pre...
- 24. May 2025, 11:08
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central to Investigate Upper Ōi River Ecosystem
Maglev Construction: Field Survey Planned for Around September — JR Central to Investigate Upper Ōi River Ecosystem May 24, 2025 A special expert panel of Shizuoka Prefecture convened on May 23 to discuss the environmental impact of the Chuo Shinkansen maglev construction. During the meeting, it wa...
- 21. May 2025, 23:50
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] JR Central Highlights Maglev's Role at Osaka Expo
- Replies: 1
- Views: 56739
[JP] JR Central Highlights Maglev's Role at Osaka Expo
JR Central Highlights Maglev's Role in Japan’s Economic and Mobility Future at Osaka Expo At the Osaka-Kansai Expo, JR Central President Shunsuke Niwa highlighted the Chuo Shinkansen’s potential to transform Japan’s economy through faster intercity travel, increased productivity, and innovation dri...
- 19. May 2025, 11:53
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] First Major Tunnel Breakthrough Achieved on Chuo MaglevLine
- Replies: 3
- Views: 60367
Re: [JP] First Major Tunnel Breakthrough Achieved on Chuo Maglev Line
Breakthrough Achieved in Linear Chuo Shinkansen Tunnel in Nagano’s Ina Mountains On May 13, JR Central announced a significant milestone in the construction of the Linear Chuo Shinkansen: two sections of the Ina Mountain Tunnel in Nagano Prefecture have successfully connected. The breakthrough join...
- 15. May 2025, 11:00
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Senior executives of Taisei and Kajima found guilty of bid-rigging
- Replies: 1
- Views: 70054
[JP] High-Speed Maglev Bid-Rigging Case
鹿島と大成建設、二審も敗訴 リニア談合、排除命令で Kashima and Taisei Lose Appeal in High-Speed Maglev Bid-Rigging Case – Tokyo High Court Upholds Antitrust Ruling Info based on Kyodo News, quoted by https://www.msn.com/ja-jp/news/national/%E9%B9%BF%E5%B3%B6%E3%81%A8%E5%A4%A7%E6%88%90%E5%BB%BA%E8%A8%AD-%E4%BA%8C%E5%AF%A9%E...
- 4. May 2025, 13:16
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] Baltimore - Washington Maglev: Strong criticism from opponents
- Replies: 0
- Views: 105143
[US] Baltimore - Washington Maglev: Strong criticism from opponents
Baltimore - Washington Maglev: Strong criticism from opponents . Screenshot 2025-05-04 131405.jpg . Photo: Screenshot from https://www.thebaltimorebanner.com/opinion/letters/maglev-maryland-not-needed-GYCBPPM2DBGBPLM3U5NOGKCWOY/ Accessed 2025-0ß5-24 The proposed Maglev train between Washington, D.C...
- 1. May 2025, 23:42
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Tokyo Shinagawa Station (Urban development) development
- Replies: 13
- Views: 86148
Re: [JP] Tokyo Shinagawa Station (Urban development) development
Tokyo Shinagawa Maglev Station development Construction of the new Chuo Shinkansen (Linear Maglev) station at Shinagawa is progressing directly beneath the Tokaido Shinkansen tracks and the JR Shinagawa Station building. This ambitious project involves temporarily supporting above-ground structures...
- 30. Apr 2025, 21:27
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Tokai explanatory meetings
From March 7 to April 26, over 700 residents participated in a series of explanatory meetings hosted by JR Tokai in eight cities and two towns along the Oigawa River basin. These sessions addressed local concerns about the Linear Central Shinkansen tunnel construction project. JR Tokai President Shu...
- 25. Apr 2025, 20:17
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
[JP] JR Central to Use Arsenic-Containing Soil for Linear Maglev Construction
JR Central to Use Arsenic-Containing Soil for Linear Shinkansen Construction Amid Resident Concerns in Nagano At a community meeting held on April 23, 2025, JR Central (JR Tokai) announced its plan to use soil containing arsenic ("special measures soil") as construction material for bridg...
- 24. Apr 2025, 18:39
- Forum: Hyperloop concepts
- Topic: The Hyperloop Dilemma: Why the Futuristic Transit System Remains Elusive
- Replies: 0
- Views: 109465
The Hyperloop Dilemma: Why the Futuristic Transit System Remains Elusive
The Hyperloop, proposed by Elon Musk in 2012, was envisioned as a revolutionary high-speed transport system, where pods would travel through low-pressure or vacuum tubes at near-supersonic speeds. Initially hailed as the future of transportation, the concept gained global attention, with companies a...
- 22. Apr 2025, 22:39
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Prof. Fujii Calls for Hokuriku Shinkansen Extension Before Maglev to Secure Regional Future
- Replies: 0
- Views: 106563
[JP] Prof. Fujii Calls for Hokuriku Shinkansen Extension Before Maglev to Secure Regional Future
「北陸新幹線大阪延伸はリニアより先に」京大大学院・藤井聡教授 “投資は回収可能” 北陸新幹線早期全線開業訴える Prof. Fujii Calls for Hokuriku Shinkansen Extension Before Maglev to Secure Regional Future Professor Satoshi Fujii of Kyoto University, an expert in transportation engineering, delivered a speech in Kanazawa advocating for the early full exte...
- 10. Apr 2025, 17:38
- Forum: Korean Hyperloops
- Topic: [KR] Propulsion tech research for Hypertube train
- Replies: 0
- Views: 107984
[KR] Propulsion tech research for Hypertube train
South Korea launches research on maglev propulsion tech for envisioned Hypertube train . 67f6f5a61af8d273823e%20copy-9573d518-336e-441e-87e7-d6db17d48ce7[1].jpeg . Source: https://bna-media.s3-eu-west-1.amazonaws.com/Media/Images/News/World-News/67f6f5a61af8d273823e%20copy-9573d518-336e-441e-87e7-d...
- 8. Apr 2025, 11:14
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] "Even the Boars Are Gone": The Drying Waters and Local Anger Over the Maglev Construction
- Replies: 6
- Views: 70515
[JP] The Drying Waters and Local Anger Over the Maglev Construction
Water Shortages Near Maglev Construction Site in Kasugai, Aichi – MP Motomura Investigates Water sources have dried up near the Nishi-O section of the Linear Chuo Shinkansen (Maglev) construction in Kasugai City, Aichi Prefecture, prompting concern among residents. On April 6, Japanese Communist Pa...
- 4. Apr 2025, 19:29
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Maglev – 28 Years Since Test Runs Began
- Replies: 0
- Views: 107429
[JP] Maglev – 28 Years Since Test Runs Began
. 「リニア中央新幹線」で変わる“日本のミライ”体感 走行試験開始から28年 Chuo Shinkansen Maglev – 28 Years Since Test Runs Began Japan’s Chuo Shinkansen—powered by superconducting magnetic levitation (maglev) technology—is poised to redefine high-speed travel and reshape the nation’s future. Since test operations began in 1997 on th...
- 31. Mar 2025, 11:56
- Forum: Other fields of application for Maglev technologies
- Topic: [CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028
- Replies: 1
- Views: 61322
Re: [CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028
Private Chinese space firm Galactic Energy is at the forefront of this innovation. The company is working on an electromagnetic rocket launch system that leverages maglev (magnetic levitation) technology. The goal is to propel rockets to space at high speeds, dramatically increasing launch efficien...
- 28. Mar 2025, 13:36
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Lida City and Maglev Station Implementation impact
- Replies: 30
- Views: 119559
[JP] Iida City Gathers Local Input on New Maglev Station Plaza
リニア新幹線 新駅駅前広場 飯田市が地元業者から意見聞く Iida City Gathers Local Input on New Maglev Station Plaza On March 27, Iida City held a meeting to hear opinions from local businesses and stakeholders regarding the planned station plaza in front of the upcoming Linear Chuo Shinkansen station. While JR Central has aban...
- 27. Mar 2025, 16:39
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Tokyo Court Dismisses Request to Halt Maglev Construction
- Replies: 0
- Views: 107746
[JP] Tokyo Court Dismisses Request to Halt Maglev Construction
Tokyo Court Dismisses Request to Halt Maglev Construction, Citing No Risk of Ground Subsidence On March 27, the Tokyo District Court rejected a lawsuit filed by 23 residents from Tokyo’s Ota and Setagaya wards seeking to halt underground tunneling for the Chuo Shinkansen maglev project, being devel...
- 25. Mar 2025, 19:10
- Forum: Other fields of application for Maglev technologies
- Topic: [CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028
- Replies: 1
- Views: 61322
[CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028
China Plans Maglev Rocket Launch Pad to Rival SpaceX by 2028 China is aiming to challenge SpaceX and the U.S. space industry by developing an electromagnetic rocket launch system, set to debut by 2028. Led by private aerospace firm Galactic Energy, in collaboration with state-backed institutes in S...
- 23. Mar 2025, 10:42
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Tokai: "We plan to continue ...."
JR Central President Shunsuke Niwa has expressed his commitment to continuing public briefing sessions for residents living along the Ōi River regarding the Linear Chuo Shinkansen (maglev train) project. These sessions, which began on March 7, aim to address concerns about the project's environmenta...
- 15. Mar 2025, 21:15
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] Northeast Maglev - Poll results
- Replies: 1
- Views: 68761
[US] Northeast Maglev - Poll results
Support for Maryland’s Maglev Project, But Questions Remain A recent poll conducted by Lake Research Partners indicates broad support for the Northeast Maglev, a high-speed train proposed to connect Washington and Baltimore in 15 minutes. According to the survey, 67% of Maryland voters support the ...
- 11. Mar 2025, 16:13
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] Progress in Water Issue Talks for Shizuoka Section of Maglev Project
A Shizuoka Prefecture expert panel discussing issues related to the Linear Chuo Shinkansen’s Shizuoka section met on March 11. The session focused on five remaining discussion points with JR Central regarding water resources, three of which were agreed upon. A panel member noted that while the gener...
- 9. Mar 2025, 21:59
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Kofu City Station debate
- Replies: 7
- Views: 70954
Re: [JP] Kofu City Station debate
Kofu City has finalized its "Basic Infrastructure Development Policy for the Linear Yamanashi Station Area," which outlines plans for urban infrastructure, including the arrangement of public facilities and project schedules. This policy aims to implement the "Basic Concept for City D...
- 5. Mar 2025, 11:44
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
- Replies: 4
- Views: 63656
[JP] Improper Handling of Hazardous Soil in Linear Project
Improper Handling of Hazardous Soil in Linear Project In February 2025, a significant issue was uncovered during the construction of the Linear Chuo Shinkansen in Yamanashi Prefecture, Japan, involving the improper handling of hazardous construction soil. The construction waste, which contained har...
- 3. Mar 2025, 17:31
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Maglev Tunnel Construction Delayed by 5,5 Years (Yamanashi )
- Replies: 1
- Views: 60234
[JP] Maglev Tunnel Construction Delayed by 5,5 Years (Yamanashi )
Linear Tunnel Construction Extended by Five and a Half Years JR Tokai announced on March 3 that the construction of five tunnels and bridges for the Linear Shinkansen Line in the towns of Hayakawa and Fujikawa in Yamanashi Prefecture, which was originally scheduled to be completed between October ...
- 25. Feb 2025, 23:20
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] New Linear Maglev Station in Hashimoto Becomes a Public Attraction
- Replies: 4
- Views: 67402
Re: [JP] Sagamihara to Host 'Linear Future Stage' at Maglev Site in March
The city of Sagamihara will host the "Sagamihara Linear Future Stage" on March 22 and 23 at the "Sagamihara Linear Plaza," located at the construction site of the new Linear Chuo Shinkansen station in Midori Ward. The event will feature performances by children and marks the conc...
- 18. Feb 2025, 12:08
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
- Replies: 4
- Views: 63656
[JP] Excavated Soil at Linear Chuo Shinkansen Construction Site Stored "Improperly"
Excavated Soil at Linear Chuo Shinkansen Construction Site Stored "Improperly" At the construction site for the Linear Chuo Shinkansen in Fuefuki City, it was discovered that a contractor commissioned by JR Tokai had stored excavated soil in violation of the environmental protection plan ...
- 15. Feb 2025, 15:01
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
[JP] Nagano Urges JR Central to Strengthen Environmental Measures
Residents Protest Nagano Prefecture's Advisory on Contaminated Soil for Shinkansen Station Construction On February 14, a local resident group in Iida City, Nagano Prefecture, protested a January advisory issued by the prefecture regarding the environmental preservation plan for the construction of...
- 13. Feb 2025, 12:24
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] The Shizuoka Water & Maglev Tunnel Problem
リニア工事 水資源への影響 JR東海 住民対象の説明会開催 JR Central to Hold Public Briefings on Linear Chuo Shinkansen Water Resource Impact JR Central has announced that starting in March, it will hold public briefings for residents of municipalities along the Oi River regarding the impact of Linear Chuo Shinkansen construc...
- 10. Feb 2025, 17:24
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] DC to Baltimore in 15 Minutes: High-Speed Maglev Moves Forward
- Replies: 2
- Views: 65487
- 10. Feb 2025, 17:23
- Forum: USA: Baltimore - Washington Maglev Project
- Topic: [US] DC to Baltimore in 15 Minutes: High-Speed Maglev Moves Forward
- Replies: 2
- Views: 65487
[US] DC to Baltimore in 15 Minutes: High-Speed Maglev Moves Forward
DC to Baltimore in 15 Minutes As Plans For High-Speed Maglev Move Forward . tnem-maryland-cx[1].jpg Photo: https://www.bizjournals.com/washington/news/2025/01/31/baltimore-washington-maglev-train-project-progress.html Accessed: 2025-02-10 . The planned high-speed train connecting Washington, DC, an...
- 10. Feb 2025, 17:14
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Stalled Maglev Progress in Shizuoka
- Replies: 7
- Views: 72254
[JP] The Stalled Maglev Progress in Shizuoka
JR Tokai President Shunsuke Niwa, who is aiming for an early start of construction of the Shizuoka construction zone, the most difficult task associated with the opening of the Linear Line, paid a courtesy visit to Governor Yasutomo Suzuki at the Shizuoka Prefectural Government Office on the evening...
- 8. Feb 2025, 21:55
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] JR Tokai begins excavation of Aichi section 2 of the Linear Tunnel
- Replies: 1
- Views: 65225
[JP] Development Plan Using Maglev Excavation Soil in Achi Village
Development Plan Using Maglev Excavation Soil in Achi Village Achi Village in Japan has unveiled plans to use excavation soil from the Chūō Shinkansen (Maglev) project for development in the Nanaguri area. This initiative, introduced during the first meeting of the "Nanaguri Development Projec...
- 6. Feb 2025, 19:00
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Stalled Maglev Progress in Shizuoka
- Replies: 7
- Views: 72254
[JP] Shizuoka Governor Stresses Resolution of 24 Key Issues
Prioritizing Dialogue: Shizuoka Governor Stresses Resolution of 24 Key Issues in Linear Shinkansen Project Shizuoka Governor Yasutomo Suzuki reiterated in a press conference on the 6th that resolving 24 key discussion points with JR Tokai remains the top priority regarding the Linear Chuo Shinkanse...
- 4. Feb 2025, 12:36
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Stalled Maglev Progress in Shizuoka
- Replies: 7
- Views: 72254
[JP] Maglev and Shizuoka Shinkansen stops
On January 30, JR Tokai President Shunsuke Niwa expressed his intention to increase the number of “Hikari” trains stopping at Hamamatsu Station in Shizuoka from the current one to two per hour when the Linear Central Shinkansen between Shinagawa and Nagoya begins service. He made the announcement du...
- 3. Feb 2025, 15:33
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Stalled Maglev Progress in Shizuoka
- Replies: 7
- Views: 72254
[JP] Shizuoka's Economic Boost: Increased 'Hikari' Stops Linear Maglev Launch
Shizuoka's Economic Boost: Increased 'Hikari' Stops with Linear Shinkansen Launch JR Tokai President, Shunsuke Niwa, revealed plans to increase the number of “Hikari” stops in Shizuoka Prefecture once the Linear Shinkansen (Maglev) opens between Tokyo and Nagoya. Currently, Shizuoka and Hamamatsu s...
- 30. Jan 2025, 22:05
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP]JR Central Proposes Increased "Hikari" Stops with Linear Shinkansen Opening
JR Central President Shunsuke Niwa met with Shizuoka Governor Hisashi Suzuki on January 30 to discuss the potential impact of the Linear Chuo Shinkansen, which is yet to be approved for construction in Shizuoka Prefecture. Niwa proposed that when the line opens between Shinagawa and Nagoya, the numb...
- 28. Jan 2025, 12:19
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
- Replies: 7
- Views: 72378
[JP] Nagano Urges JR Central to Strengthen Environmental Measures
Nagano Urges JR Central to Strengthen Environmental Measures Nagano Prefecture has urged JR Central to enhance its environmental measures regarding the planned use of "regulated soil" containing heavy metals such as arsenic in the foundation work for the Dosogawa Bridge, part of the Linea...
- 27. Jan 2025, 22:47
- Forum: Conferences & Events
- Topic: [IN] Asia's first Global Hyperloop Competition; February 21-25, 2025
- Replies: 1
- Views: 63486
[IN] Asia's first Global Hyperloop Competition; February 21-25, 2025
Asia's first Global Hyperloop Competition; February 21-25, 2025 IIT Madras will host Asia's first Global Hyperloop Competition (GHC) from February 21-25, 2025, aiming to revolutionize global transportation. The event will take place at the university's advanced 450-meter Hyperloop test track in Tha...
- 25. Jan 2025, 18:43
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] JR Central Links Ground Subsidence to Chuo Maglev Construction
JR Central announced on January 18, 2025, that ground subsidence near the tunnel construction site of the Linear Chuo Shinkansen in Mizunami, Gifu Prefecture, is likely caused by the ongoing construction activities. The subsidence occurred in Okuchi Town, where groundwater levels dropped during tunn...
- 24. Jan 2025, 23:44
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] Criticism of JR Tokai: Inadequate Explanations and Investigations into Air Bubbles Issue in Machida
On January 22, Takashi Yamao, a member of the House of Councillors from the Japanese Communist Party, visited JR Tokai's Tokyo construction office to press the company for answers regarding a serious issue that has arisen from ongoing tunnel construction work for the Linear Shinkansen project in the...
- 22. Jan 2025, 17:57
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] JR Tokai Urged to Address Groundwater and Subsidence Issues at Linear Shinkansen Site
A meeting of Gifu Prefecture's Environmental Impact Assessment Committee was held on January 22 to discuss ongoing issues at a construction site for the Linear Chuo Shinkansen tunnel in Mizunami City. Water has been seeping from the tunnel, causing a drop in water levels in surrounding wells and gro...
- 20. Jan 2025, 14:22
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] Ground Subsidence in Gifu Linked to Maglev Tunnel Construction
Ground Subsidence in Gifu Linked to Maglev Tunnel Construction, JR Tokai Investigates Impact" Ground subsidence in Gifu Prefecture is likely linked to tunnel construction for the Chuo Shinkansen Line, also known as the maglev line, according to Central Japan Railway Co. (JR Tokai). In the Okut...
- 19. Jan 2025, 13:25
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] Water Level Decline in Mizunami: Countermeasures Delayed Until April
Water Level Decline in Mizunami: Countermeasures Delayed Until April In Mizunami City, Gifu Prefecture, a water level decline issue has arisen due to tunnel construction for the Linear Chuo Shinkansen, with spring water gushing out and surrounding well water levels dropping. On January 18, JR Centra...
- 18. Jan 2025, 20:39
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP]Link Between Linear Chuo Shinkansen Construction and Gifu Ground Subsidence Confirmed by JR Centrall
Link Between Linear Chuo Shinkansen Construction and Gifu Ground Subsidence Confirmed by JR Central JR Central announced on January 18 that the ground subsidence near the Linear Chuo Shinkansen tunnel construction site in Ōtsu Town, Mizunami City, Gifu Prefecture, is highly likely linked to a drop ...
- 17. Jan 2025, 13:13
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
- Replies: 10
- Views: 81033
[JP] Central Alps Tunnel
On January 16, 2025, JR Tokai announced that the main tunnel of the "Central Alps Tunnel" for the Maglev Chuo Shinkansen had successfully crossed the Nagano-Gifu Prefecture border. The tunnel, which spans approximately 23 kilometers, connects Iida City in Nagano Prefecture to Nakatsugawa C...
- 16. Jan 2025, 18:48
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Racing to Kansai: Leaders Push for Faster Linear Shinkansen Completion Amid Mounting Challenges
- Replies: 3
- Views: 65783
[JP] Experts Discuss Benefits of Maglev for Mie Prefecture
"Experts Discuss Strategies to Maximize the Economic and Tourism Benefits of the Linear Chuo Shinkansen for Mie Prefecture" A committee of experts met to discuss how the opening of the Linear Chuo Shinkansen will benefit the entire Mie Prefecture, focusing on how to spread the economic an...
- 15. Jan 2025, 18:05
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central President: Accelerating Dialogue for Maglev Construction
JR Central President: Accelerating Dialogue for Maglev Construction On January 15, JR Central President Shunsuke Niwa expressed his commitment to accelerating discussions to enable the early construction of the Linear Chuo Shinkansen. His remarks followed Shizuoka Governor Heita Suzuki's statement ...
- 10. Jan 2025, 21:52
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Tokai Resumes Linear Chuo Shinkansen Tunnel Excavation in Yamanashi
JR Tokai Resumes Linear Chuo Shinkansen Tunnel Excavation in Yamanashi On January 8, JR Tokai announced the resumption of excavation for the "pilot tunnel" in Yamanashi Prefecture, which had been suspended. The tunnel work, part of the Linear Chuo Shinkansen’s South Alps Tunnel, will proc...
- 9. Jan 2025, 12:52
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
- Replies: 226
- Views: 3416371
[JP] JR Central announces the resumption of excavation work
JR Central announced the resumption of excavation work on the advanced tunnel for the Linear Chuo Shinkansen project, starting from January 8. This tunnel is located near the border between Yamanashi and Shizuoka Prefectures, where work had previously halted 478 meters before reaching the boundary. ...
- 6. Jan 2025, 23:49
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] Kofu City Station debate
- Replies: 7
- Views: 70954
[JP] Kofu City Station debate
Yamanashi Linear Shinkansen Station to Begin Construction in 2025: Kofu Mayor Aims for Global Attention At a New Year's press conference on January 6, Kofu Mayor Yuichi Higuchi announced that construction of the Yamanashi Linear Chuo Shinkansen Station (tentative name) will commence in 2025. He emp...
- 6. Jan 2025, 23:46
- Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
- Topic: [JP] "Delays Mount for Linear Chūō Shinkansen: 18 Sections Won't Meet 2027 Deadline, Yamanashi Station Delayed to 2031
- Replies: 3
- Views: 66119
[JP] Shizuoka Governor: Difficult to Conclude Linear Shinkansen Talks with JR Central by Year-End
Shizuoka Governor: Difficult to Conclude Linear Shinkansen Talks with JR Central by Year-End Shizuoka Governor Heita Suzuki acknowledged in a press conference on January 6 that completing ongoing discussions with JR Central regarding the Linear Chuo Shinkansen project within this year would be diff...