Search found 414 matches

by latestnews
25. Feb 2026, 14:13
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] JR Tokai Pitches Tourism-Led “Regional Revitalization” to Oi River

J JR東海、地域振興策を提案 リニアめぐり大井川流域首長と意見交換 JR Tokai Pitches Tourism-Led “Regional Revitalization” to Oi River Leaders—But Mayors Warn Against Linking It to Water Compensation On Feb. 23, 2026, JR Tokai President Shunsuke Niwa met in Shizuoka City with the heads of eight cities and two towns in the Oi River ...
by latestnews
22. Feb 2026, 16:14
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Kanagawa Linear Maglev Station (Hashimoto)
Replies: 14
Views: 37776

Re: [JP] Kanagawa Linear Maglev Station (Hashimoto)

Maglev-Era Road Plan Sparks Backlash in Sagamihara: ¥17.4B Project, ~100 Relocations, and a “40-Second Benefit” Redevelopment around Hashimoto Station (Sagamihara City, Midori Ward)—the site of the planned Kanagawa maglev station—includes a new city road project, the Onishi Odori Line, aimed at imp...
by latestnews
21. Feb 2026, 15:42
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] JR Tokai Starts Expanding “Sengoku Yard” in Shizuoka
Replies: 1
Views: 201

Re: [JP] JR Tokai Starts Expanding “Sengoku Yard” in Shizuoka

JR Tokai Starts Expanding Shizuoka Maglev Work Base, Launches Tree-Clearing at Sengoku Yard On Feb. 16, 2026, JR Tokai began expansion work at Sengoku Yard, its construction base for the Chuo Shinkansen (maglev) Shizuoka segment, located in Tashiro, Aoi Ward, Shizuoka City. Tree felling started tha...
by latestnews
19. Feb 2026, 10:56
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] "Even the Boars Are Gone": The Drying Waters and Local Anger Over the Maglev Construction
Replies: 7
Views: 86732

[JP] JR Tokai Floats Forest Thinning to Aid Groundwater Recovery Near Maglev Tunnel

リニア工事現場付近、地下水回復へ間伐検討 岐阜 JR東海が説明「効果は限定的」 JR Tokai Floats Forest Thinning to Aid Groundwater Recovery Near Maglev Tunnel—Impact Expected to Be Limited A Gifu Prefecture expert committee met on Feb. 18, 2026 to address the ongoing groundwater decline affecting wells near the Chuo Shinkansen tunnel sit...
by latestnews
18. Feb 2026, 13:18
Forum: Conferences & Events
Topic: [JP] Iida City Hosts Public Event on a Landmark Timber Roof for the Future Maglev Station Plaza
Replies: 0
Views: 311

[JP] Iida City Hosts Public Event on a Landmark Timber Roof for the Future Maglev Station Plaza

Iida Hosts Public Event on a Landmark Timber Roof for the Future Maglev Station Plaza Iida City (Nagano) is holding a public lecture and panel discussion focused on the large wooden roof canopy planned for the Iida Linear (Maglev) Station Plaza. The event is meant to explain why the city is investi...
by latestnews
16. Feb 2026, 22:05
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] JR Tokai Starts Expanding “Sengoku Yard” in Shizuoka
Replies: 1
Views: 201

[JP] JR Tokai Starts Expanding “Sengoku Yard” in Shizuoka

JR Tokai Starts Expanding “Sengoku Yard” in Shizuoka, Clearing Trees for Maglev Prep Works リニア工事の拠点拡張に着手 JR東海、静岡工区で On Feb. 16, 2026, JR Tokai began expansion work at its Sengoku Yard construction base in the Shizuoka segment of the Chuo Shinkansen (maglev), located in Tashiro, Aoi Ward, Shizuoka C...
by latestnews
14. Feb 2026, 00:08
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] Shizuoka and JR Tokai Sign Deal to Begin Prep Work Toward Maglev Construction

Shizuoka and JR Tokai Sign Deal to Begin Prep Work Toward Maglev Construction Shizuoka Prefecture and JR Tokai signed an agreement on Feb. 13, 2026 to enable development of a construction yard for the Chuo Shinkansen’s Shizuoka segment. The yard is intended to function as a base for environmental s...
by latestnews
12. Feb 2026, 18:22
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] The Shizuoka Water & Maglev Tunnel Problem

JR Central (JR Tokai) has cleared a major hurdle for the Linear Central Shinkansen with an unprecedented agreement on water resource compensation in Shizuoka Prefecture, paving the way for construction start this year. JR Tokai and Shizuoka exchanged a written pact addressing environmental water imp...
by latestnews
4. Feb 2026, 16:05
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
Replies: 6
Views: 78091

[JP] Shizuoka Panel OKs Plan for Maglev Hazard-Soil Handling

Shizuoka Panel OKs Plan for Hazard-Soil Handling; Maglev “Dialogue Items” Narrow Further Shizuoka Prefecture’s expert panel approved JR Tokai’s proposed method for handling “requiring-countermeasures soil”—tunnel spoil that contains harmful substances and needs special treatment—generated by constr...
by latestnews
4. Feb 2026, 15:47
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
Replies: 6
Views: 78091

Re: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction

Shizuoka Maglev Segment Advances: Panel Approves JR Tokai Plan for Contaminated Tunnel Spoil On Feb. 4, 2026, Shizuoka Prefecture’s expert panel met at the prefectural government offices to review how tunnel excavated material (spoil) from the Chuo Shinkansen’s Shizuoka segment will be handled. JR ...
by latestnews
2. Feb 2026, 18:52
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Tokyo Shinagawa Station (Urban development) development
Replies: 15
Views: 107693

[JP] Tokyo Shinagawa (Maglev) Station development

Shinagawa’s Mega-Redevelopment: Maglev Terminal, New Subway Station, and a Keikyu–Toyota Landmark A large-scale redevelopment is reshaping the area around Shinagawa Station into a next-generation transport hub. The plan combines multiple major rail and real-estate projects on overlapping timelines:...
by latestnews
1. Feb 2026, 21:55
Forum: Websites, Web & Publications
Topic: [JP] Book Portrays Japan’s Maglev Project as a Systemic Breakdown
Replies: 0
Views: 672

[JP] Book Portrays Japan’s Maglev Project as a Systemic Breakdown

<書評>『最新報告 混迷のリニア中央新幹線』樫田秀樹 著 A New Book Portrays Japan’s Maglev Project as a Systemic Breakdown—With Real-World Costs A review by Takao Saito covers Latest Report: Confusion Surrounding the Linear Chuo Shinkansen by Hideki Kashida, describing the current state of the Linear Chuo Shinkansen as near-...
by latestnews
31. Jan 2026, 14:37
Forum: Arab Countries
Topic: [UAE] Etihad Rail tests UAE’s first magnetic levitation rail in Middle East
Replies: 2
Views: 1035

[UAE] Etihad Rail announces a partnership with IronLev

Etihad Rail announces a partnership with IronLev, a high-tech Italian pioneer, to launch the UAE’s first-ever magnetic levitation (maglev) trial. The system will use permanent magnets to lift the train above existing rails without needing a constant stream of electricity to stay afloat. As Etihad R...
by latestnews
31. Jan 2026, 14:31
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] The Shizuoka Water & Maglev Tunnel Problem

川勝前知事は正しかった? 「リニアで井戸枯れ」報道受け静岡に脚光 Maglev Tunneling Fallout in Gifu Puts Shizuoka’s Water Warnings Back in the Spotlight In Okute (Ōkute), Mizunami City, Gifu Prefecture, a well known as “Tenno-sama’s Well,” said to have never run dry in centuries, has dried up after a major groundwater decline linke...
by latestnews
28. Jan 2026, 16:39
Forum: Other fields of application for Maglev technologies
Topic: [CN] Restaurant uses maglev tech to serve food
Replies: 1
Views: 1149

[CN] Restaurant uses maglev tech to serve food

Screenshot of a short video: Screenshot 2026-01-28 163734.jpg A restaurant in China's Shenzhen is using magnetic levitation to serve food. Plates float along tracks to arrive smoothly in front of each diner. Source: Xinhua: https://english.news.cn/20260128/6aa0eb6562fc4eb189431124e9bb5fb3/c.html Acc...
by latestnews
28. Jan 2026, 16:34
Forum: Arab Countries
Topic: [UAE] Etihad Rail tests UAE’s first magnetic levitation rail in Middle East
Replies: 2
Views: 1035

[UAE] Etihad Rail tests UAE’s first magnetic levitation rail in Middle East

Etihad Rail tests UAE’s first magnetic levitation rail in Middle East Etihad Rail and IronLev a high-tech Italian company have launched a first-of-its-kind magnetic levitation trial in the Middle East. It reduces energy use by 29%, for a quieter, eco-friendly journey in the UAE . gulfnews_2026-01-2...
by latestnews
26. Jan 2026, 13:15
Forum: Conferences & Events
Topic: [JP] Nagoya City Public Maglev Symposium
Replies: 0
Views: 326

[JP] Nagoya City Public Maglev Symposium

Nagoya Unveils “Meieki West” Maglev-Era Town Plan at Public Symposium Nagoya City is hosting the “Linear Town Meieki West Symposium” to share its emerging urban development policy for the west side of Nagoya Station, planned in anticipation of the Chuo Shinkansen (maglev) opening. The event is cate...
by latestnews
22. Jan 2026, 22:30
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] Resumption of Discussions Regarding the Maglev Soil Disposal Site Plan

Resumption of Discussions Regarding the Linear Project Excavated Soil Disposal Site Plan Statement from Mitake (https://www.town.mitake.lg.jp/news/news0098062/) Accessed 2026-01-22 (translated from Japanese) On May 16, 2024, Mitake Town requested JR Central to clarify the factual circumstances rela...
by latestnews
21. Jan 2026, 18:16
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] The Shizuoka Water & Maglev Tunnel Problem

Shizuoka Prefecture held an expert committee meeting on the Linear Chuo Shinkansen’s Shizuoka construction section, where JR Central explained its environmental protection measures. Based on on-site surveys, the company presented results on identified species and a monitoring plan for the upper reac...
by latestnews
17. Jan 2026, 11:16
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Meijo Section Tunnel Excavation in Nagoya to begin in January 2026
Replies: 1
Views: 767

[JP] Maglev Tunnel Construction Begins Under Central Nagoya

Maglev Tunnel Construction Begins Under Central Nagoya for Japan’s Maglev Line Construction has officially begun on a key underground section of Japan’s Chuo Shinkansen maglev railway beneath central Nagoya. The project segment, known as the “Meijo section,” is a critical part of the future high-sp...
by latestnews
12. Jan 2026, 18:53
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: Expected effects of Gifu Maglev Station
Replies: 6
Views: 21097

[JP] Progress at the Planned Gifu Maglev Station

Construction activity is intensifying north of Mino-Sakamoto Station on the JR Chuo Line in Nakatsugawa City, Gifu Prefecture, where a new Chuo Shinkansen “Gifu Prefecture Station” (tentative name) is planned. Station works and related infrastructure projects are proceeding in parallel across the su...
by latestnews
10. Jan 2026, 14:20
Forum: Medium Speed (Ecobee)
Topic: [KR] Incheon Airport's 450 Billion Won Maglev Rides Empty
Replies: 0
Views: 518

[KR] Incheon Airport's 450 Billion Won Maglev Rides Empty

Incheon Airport's 450 Billion Won Maglev Rides Empty Next-Gen Transport Turned 'White Elephant' with Daily Ridership Below 1,000 South Korea’s Incheon Airport maglev train, launched in 2016, is widely seen as a costly “white elephant” despite massive public investment. The central government, Inche...
by latestnews
8. Jan 2026, 12:12
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] PR: Maglev Meets the Classroom: Achi High Seniors Talk Local Future
Replies: 1
Views: 581

[JP] PR: Maglev Meets the Classroom: Achi High Seniors Talk Local Future

阿智高で「リニア中央新幹線」テーマの授業 卒業前に地元を知る機会に Maglev Meets the Classroom: Achi High Seniors Talk Local Future On January 7, Achi High School in Achi Village, Nagano Prefecture held a special class on the Chuo Shinkansen (maglev) for 62 graduating seniors, inviting staff from JR Tokai and the Chuo Shinkansen Na...
by latestnews
7. Jan 2026, 17:47
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Chubu Region: With Maglev Aiming for a ¥280 Trillion Economic Zone
Replies: 2
Views: 1717

[JP] JR Tokai plans to step up the dissemination of information

Shunsuke Niwa, president of Central Japan Railway Co., or JR Tokai, has stressed that the company will continue promoting the construction of the Chuo Shinkansen high-speed magnetic levitation train line. "We will steadily work (on the construction)," he said in a recent interview in Nagoy...
by latestnews
2. Jan 2026, 12:44
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] JR Tokai plans to export maglev technology
Replies: 2
Views: 690

Re: [JP] JR Tokai Maglev eyes markets overseas

JR Tokai's President Niwa Expresses Interest in Expanding Maglev Technology Overseas, Eyes Markets Beyond the US In an interview with the Nihon Keizai Shimbun and other media outlets, Shunsuke Niwa, the president of JR Tokai, expressed his desire to expand the technology behind the Maglev Chuo Shin...
by latestnews
31. Dec 2025, 01:38
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo
Replies: 10
Views: 5794

[JP] Shinagawa Ground Heave Above Maglev Tunnel

Shinagawa Ground Heave Above Maglev Tunnel: JR Tokai Cites Air Leak, MLIT Calls Management “Inadequate” On December 30, 2025, lawmakers and local officials urged Japan’s Ministry of Land, Infrastructure, Transport and Tourism (MLIT) to more aggressively press JR Tokai to clarify responsibility for ...
by latestnews
28. Dec 2025, 22:27
Forum: Germany
Topic: [DE] Bögl receives permission to operate maglevs in Germany
Replies: 3
Views: 3536

Re: [DE] Bögl receives permission to operate maglevs in Germany

Parrahub1 wrote:
15. Dec 2025, 05:58
They sound a bit dodgy believing in hydrogen and going broke.
They are one of Germany's most important construction companies and certainly anything but bankrupt. They know what they are doing – but you don't have to like it, of course.
by latestnews
22. Dec 2025, 00:40
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo
Replies: 10
Views: 5794

Re: [JP] Road Heave Near Maglev Construction Site in Tokyo Prompts Investigation

リニア大深度トンネル上で隆起、現場を掘削して工事との因果関係調査 Info based on https://xtech.nikkei.com/atcl/nxt/mag/ncr/18/00158/121100062/ Accessed 2025-12-22 . 8_02[1].jpg . Source: https://cdn-xtech.nikkei.com/atcl/nxt/mag/ncr/18/00158/121100062/8_02.jpg Accessed 2025-12-22 A road-surface heave occurred near a deep undergroun...
by latestnews
18. Dec 2025, 20:20
Forum: Websites, Web & Publications
Topic: [JP] JR Central and Nara Prefecture Collaborate on Tourism Promotion Maglev Video Series
Replies: 0
Views: 1785

[JP] JR Central and Nara Prefecture Collaborate on Tourism Promotion Maglev Video Series

JR Central and Nara Prefecture Collaborate on Tourism Promotion Maglev Video Series JR Central announced that it will begin distributing a video series in collaboration with Nara Prefecture to promote tourism. When the Chūō Shinkansen (Linear Maglev) fully opens to Osaka, a new station will be buil...
by latestnews
18. Dec 2025, 20:12
Forum: India
Topic: [IN] Contract to Deploy Cargo Maglev at Deendayal Port: Overview
Replies: 2
Views: 1233

[IN] Contract to Deploy Cargo Maglev at Deendayal Port: Overview

Contract to Deploy a Cargo Maglev at Deendayal Port A formal contract has been established between Deendayal Port and the startup TuTr Hyperloop to deploy magnetic-levitation (maglev) technology for freight transport within the port. This agreement focuses on using maglev for intra-port logistics. ...
by latestnews
17. Dec 2025, 14:48
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Controversial Power Hub: Oshibugawa Substation and Japan’s Maglev Future
Replies: 1
Views: 825

[JP] Controversial Power Hub: Oshibugawa Substation and Japan’s Maglev Future

Controversial Power Hub: Oshibugawa Substation and Japan’s Maglev Future The Oshibugawa Substation is a key piece of infrastructure for Japan’s Linear Maglev (Chūō Shinkansen) project. This facility in Oshika Village will convert and supply the large amounts of electrical power needed to run the ma...
by latestnews
8. Dec 2025, 12:33
Forum: Germany
Topic: [DE] Bögl receives permission to operate maglevs in Germany
Replies: 3
Views: 3536

[DE] Bögl receives permission to operate maglevs in Germany

Max Bögl receives permission to operate maglev trains in Germany The German Federal Railway Authority (EBA) has granted a license to "TSB Betriebsgesellschaft", a subsidiary of the German construction company Max Bögl, to develop and implement a new transport system. The TSB project, whic...
by latestnews
3. Dec 2025, 17:01
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Construction Begins on Maglev Station in Yamanashi
Replies: 0
Views: 964

[JP] Construction Begins on Maglev Station in Yamanashi

JR Central to Start Work on Yamanashi Maglev Station, Aiming for 2031 Opening Central Japan Railway (JR Central) will begin construction of the Linear Chuo Shinkansen’s Yamanashi Prefecture Station in Kofu within fiscal 2025, targeting completion in December 2031. The station will be one of six bet...
by latestnews
24. Nov 2025, 16:03
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] Residents’ Briefing in Shimada, Oi River Water Problem

リニア工事めぐり静岡・島田で住民説明会 約40人が来場 Residents’ Briefing in Shimada, Shizuoka on Maglev Construction; On November 21, JR Central held a residents’ briefing in Shimada on how Chuo Shinkansen maglev construction may affect Oi River water resources. It was the second such round this year for municipalities alo...
by latestnews
24. Nov 2025, 15:58
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] Residents’ Briefing in Shimada, Oi River Water Problem

リニア工事めぐり静岡・島田で住民説明会 約40人が来場 Residents’ Briefing in Shimada, Shizuoka on Maglev Construction; On November 21, JR Central held a residents’ briefing in Shimada on how Chuo Shinkansen maglev construction may affect Oi River water resources. It was the second such round this year for municipalities alo...
by latestnews
16. Nov 2025, 14:56
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo
Replies: 10
Views: 5794

Re: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo

In Shinagawa, Tokyo, a road near the site of tunnel excavation for the Linear Chuo Shinkansen experienced an uplift measuring up to 13 centimeters in height last month. Mayor Kyoko Morisawa of Shinagawa emphasized the critical importance of verifying the implementation of countermeasures, prioritizi...
by latestnews
13. Nov 2025, 21:59
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

[JP] Rising Maglev Costs Demand a National Reassessment?

Mainichi Shimbun Editorial: Rising Maglev Costs Demand a National Reassessment? JR Central’s Linear Chuo Shinkansen maglev project between Tokyo and Nagoya has seen its estimated cost double to ¥11 trillion, with the opening delayed from 2027 to after 2035. The main causes are soaring material and ...
by latestnews
11. Nov 2025, 15:22
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] New tunnel in the Minami Alps (Shizuoka Pref.)
Replies: 3
Views: 67404

[JP] Minami-Koma Maglev Tunnel

The tunnel broke through in October 2023. The upper section’s sprayed concrete lining has been completed, and work is now underway on the lower invert section. JR Central determined that conditions were sufficiently safe to allow guided tours. Inside the tunnel, visitors could view an overview video...
by latestnews
10. Nov 2025, 22:28
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

[JP] Vehicle Advancements Contrast With Rising Construction Costs and Delays

JR Central Maglev: Vehicle Advancements Contrast With Rising Construction Costs and Delays JR Central has introduced its latest maglev test train, the M10, as part of ongoing development for the Chuo Shinkansen maglev line between Shinagawa and Nagoya. Media test rides were held on the Yamanashi Ma...
by latestnews
10. Nov 2025, 12:50
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

[JP] Japan’s Maglev Project at a Crossroads

Maglev Project at a Crossroads Japan’s ambitious Linear Chuo Shinkansen project has reached a critical turning point. JR Central now expects total construction costs to soar to ¥11 trillion—nearly twice the original estimate—making a major delay to the Tokyo–Nagoya opening all but inevitable. The m...
by latestnews
10. Nov 2025, 12:26
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] New tunnel in the Minami Alps (Shizuoka Pref.)
Replies: 3
Views: 67404

[JP] JR Central Opens Minami-Koma Maglev Tunnel to the Public for the First Time

JR Central Opens Linear Chuo Shinkansen Minami-Koma Tunnel to the Public for the First Time On November 9, JR Central (Central Japan Railway Company) held the first public viewing of the construction site for the First Minami-Koma Tunnel in Fujikawa Town, Yamanashi Prefecture. The tunnel, part of t...
by latestnews
6. Nov 2025, 20:30
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Bubbles Linked to Maglev Construction: Communist Party Delegation Demands Explanation
Replies: 17
Views: 106273

[JP] Communist Party Calls to Halt the Linear Shinkansen Project Over Rising Costs and Ground Uplift

Call to Halt the Linear Shinkansen Project Over Rising Costs and Ground Uplift Leaders of Japan’s Communist Party, Akira Koike and Taku Yamazoe, have questioned the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) about ground uplift and the sharp cost increase in the Linear Chuo Shin...
by latestnews
6. Nov 2025, 12:54
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] JR Central Unveils New M10 Maglev Train
Replies: 6
Views: 93670

[JP] JR Central’s New “M10” Maglev Test Car: Leaner, Lighter, and Faster

JR Central’s New “M10” Maglev Test Car: Leaner, Lighter, and Faster JR Central has unveiled the new M10 maglev test car on the Yamanashi Maglev Test Line, a segment that will become part of the future Chuo Shinkansen. Built by Hitachi, Ltd., the M10 entered testing in July 2025 and represents a maj...
by latestnews
5. Nov 2025, 21:33
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] The Shizuoka: Progress in Environmental Talks

Progress in Environmental Talks on the Linear Chuo Shinkansen Project (Shizuoka Section) On November 5, 2025, Shizuoka Prefecture held a meeting of its expert committee on environmental protection concerning the Linear Chuo Shinkansen construction area in Shizuoka. JR Central (JR Tokai) presented n...
by latestnews
4. Nov 2025, 23:38
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

Re: [JP] The Shizuoka Water & Maglev Tunnel Problem

A citizens' group called the "Shizuoka Network for Considering the South Alps and Linear Project" submitted a request to the city of Shizuoka on the 4th, asking for an expanded survey range of streams in the upper reaches of the Oi River, in connection with the environmental protection mea...
by latestnews
2. Nov 2025, 21:14
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

[JP] Japan’s Maglev Project Faces Uncertain Future

Rising Costs and Mounting Challenges: Japan’s Maglev Project Faces Uncertain Future The Chuo Shinkansen, Japan’s ambitious maglev (linear motor) project connecting Tokyo and Nagoya, faces soaring construction costs and continued delays. Central Japan Railway Company (JR Central) announced that tota...
by latestnews
31. Oct 2025, 11:27
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo
Replies: 10
Views: 5794

Re: [JP] Ground Uplift Detected Above Maglev Tunnel Site in Tokyo

品川区のリニア大深度トンネル上で路面隆起、段差13cm 工事との関連調査へ Road Surface Uplift Detected Above Linear Maglev Tunnel Site in Tokyo’s Shinagawa Ward Tokyo, Oct. 31, 2025 — A section of roadway in Tokyo’s Shinagawa Ward experienced ground uplift of up to 13 centimeters (about 5 inches) directly above an area where JR Centr...
by latestnews
30. Oct 2025, 16:11
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

[JP] Maglev Project: Financial Strategies and Challenges

Maglev Project: Financial Strategies and Challenges JR TOKAI recently upgraded its consolidated earnings forecast for the March 2026 fiscal year, expecting a 6% increase in sales to ¥1.937 trillion and a 5% rise in net profit, fueled by robust Tokaido Shinkansen usage. Despite strong financials, JR...
by latestnews
30. Oct 2025, 16:07
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Project Costs Surge to $73 Billion USD
Replies: 14
Views: 8968

Re: [JP] Maglev Project Costs Surge to $73 Billion USD

. The total construction cost for the Chuo Shinkansen maglev line between Tokyo (Shinagawa) and Nagoya — a distance of about 286 km (178 miles) — is now expected to reach 11 trillion yen, an increase of 4 trillion yen from the previous plan . The new estimate equals roughly $73 billion USD, €67 bil...
by latestnews
27. Oct 2025, 20:25
Forum: Conferences & Events
Topic: [ES] Hyperloop Conference, 4 November 2025
Replies: 1
Views: 4468

[ES] Hyperloop Conference, 4 November 2025

4 November 2025 https://hyperloopconference.com/ The Hyperloop Conference is the 1st international conference on high-speed transportation. Here, you will meet all the Players in the hyperloop ecosystem, including hyperloop start-ups, corporates, suppliers and investors. After three editions in Eur...
by latestnews
19. Oct 2025, 20:50
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Nagoya Maglev Station
Replies: 14
Views: 91861

[JP] Nagoya Station’s West Side Transforms from Entertainment Hub to Residential District

名古屋駅西、遊ぶ街から住む街へ リニア需要で中駒産業などビル開発 Nagoya Station’s West Side Transforms from Entertainment Hub to Residential District With the upcoming opening of the Linear Chuo Shinkansen (maglev line), redevelopment is expanding to the west side of Nagoya Station. Real estate management company Nakakoma Sangyo ...
by latestnews
18. Oct 2025, 19:45
Forum: Germany
Topic: [DE] TSB Maglev for Augsburg?
Replies: 1
Views: 7241

[DE] TSB Maglev for Augsburg?

174bbe43-e22c-4021-a7ae-30fa6be4a3f1[1].jpg . The Max Bögl transport system on the demonstration track in Chengdu, China. . Photo by TSB Boegl in https://www.schwaebische.de/regional/baden-wuerttemberg/diese-geplante-neuerung-im-bahnverkehr-waere-fast-schon-sensationell-4017126 Accessed on 2025-10-...
by latestnews
15. Oct 2025, 18:10
Forum: Other fields of application for Maglev technologies
Topic: [CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028
Replies: 5
Views: 78937

Re: [CN] Maglev Rocket Launch Pad to Rival SpaceX by 2028

Maglifter2-950x534[1].jpg Source: https://orbitaltoday.com/2025/10/14/china-plans-maglev-rocket-launch-system-by-2028/ China’s private aerospace company Galactic Energy is developing an innovative maglev rocket launch system, aiming for a demonstration by 2028. The concept uses electromagnetic acce...
by latestnews
13. Oct 2025, 11:05
Forum: Conferences & Events
Topic: [JP] Oct. 25, 2025: Sagamihara Linear Festa 2025
Replies: 0
Views: 5758

[JP] Oct. 25, 2025: Sagamihara Linear Festa 2025

Linear Chuo Shinkansen "Kanagawa Prefecture Station (provisional name)" to Host "Sagamihara Linear Festa 2025"! / Kanagawa Prefecture Kanagawa Prefecture is promoting cultural and artistic initiatives to create a lively atmosphere at the construction site of the Linear Chuo Shin...
by latestnews
5. Oct 2025, 23:31
Forum: Fundamental issues relating to mobility, transport and Maglev
Topic: [JP] Basalt Rods in Shield Tunnel Temporary Wall Cutting
Replies: 0
Views: 6191

[JP] Basalt Rods in Shield Tunnel Temporary Wall Cutting

Toda Corporation Becomes First in Japan to Use Basalt Rods in Shield Tunnel Temporary Wall Cutting Toda Corporation has become the first in Japan to adopt basalt fiber rods—an inorganic reinforcement material made from molten basalt rock—in shield tunnel construction. The rods were applied as reinf...
by latestnews
5. Oct 2025, 23:24
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] JR Central Progresses with Environmental Surveys on Southern Alps Ecosystem Amid Maglev Construction

JR Central Progresses with Environmental Surveys on Southern Alps Ecosystem Amid Maglev Construction Tokyo, October 5, 2025 — JR Central has announced significant progress in its ongoing environmental surveys aimed at predicting the ecological impact of the Linear Chuo Shinkansen (Maglev) tunnel con...
by latestnews
5. Oct 2025, 15:26
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Japan's new high-speed maglev to have non-reclining seats
Replies: 0
Views: 5687

[JP] Japan's new high-speed maglev to have non-reclining seats

JR Central Highlights Design Choice for Non-Reclining Seats on Maglev Trains Central Japan Railway Co. (JR Central) has outlined its design approach for the upcoming Linear Chuo Shinkansen maglev trains, emphasizing the decision to install non-reclining seats as "a measure to enhance passenger...
by latestnews
4. Oct 2025, 11:20
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] Shizuoka: ompletion of Upstream SurveyC

JR Central Announces Completion of Upstream Survey for Environmental Measures on Linear Chuo Shinkansen Shizuoka Section Central Japan Railway Company (JR Central) announced on October 4, 2025, that its comprehensive survey of the upstream tributaries in the Oi River Basin, conducted as part of env...
by latestnews
3. Oct 2025, 17:56
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] No Legal Issue with Soil Storage for Maglev Construction

No Legal Issue with Soil Storage for Maglev Construction, Shizuoka Prefecture Reports On October 3, Japan’s Ministry of Land, Infrastructure, Transport and Tourism held a monitoring meeting overseeing JR Central’s environmental and water protection measures for the Linear Chuo Shinkansen constructi...
by latestnews
27. Sep 2025, 23:28
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Construction of Gifu Prefecture's Linear Shinkansen Station Delayed by 6.5 Years
Replies: 5
Views: 75029

Re: [JP] Construction of Gifu Prefecture's Linear Shinkansen Station Delayed by 6.5 Years

JR東海 has announced an extension of the construction period for the Linear Chuo Shinkansen's Central Comprehensive Vehicle Base in Nakatsugawa, Gifu Prefecture. The completion deadline has been extended from March 2028 to December 2031, a delay of 3 years and 9 months. The delay is attributed to enco...
by latestnews
26. Sep 2025, 12:48
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Nagano Urges JR Central to Strengthen Environmental Measures
Replies: 10
Views: 92003

[JP] Nagano Urges early clarification of the Linear Chuo Shinkansen opening date

On September 26, 2025, Nagano Governor Shuichi Abe met with JR Central President Shunsuke Niwa in Tokyo, where he strongly urged early clarification of the Linear Chuo Shinkansen opening date. Governor Abe emphasized that making the schedule known as soon as possible is crucial for local development...
by latestnews
25. Sep 2025, 23:33
Forum: Websites, Web & Publications
Topic: [US] Baltimore - Washington Maglev: Call for support
Replies: 10
Views: 55355

[US] Baltimore-Washington Maglev Project Stopped In Its Tracks

Baltimore-Washington Maglev Project Stopped In Its Tracks Prince George’s Residents and Elected Officials Celebrate the Success of the Decade-Long Effort That Halted the $10 Billion Rail Proposal . image-145[1].jpg Photo: https://www.washingtoninformer.com/prince-georges-county-maglev-victory/ Sour...
by latestnews
25. Sep 2025, 23:12
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Construction of Gifu Prefecture's Linear Shinkansen Station Delayed by 6.5 Years
Replies: 5
Views: 75029

[JP] Construction of Gifu Prefecture's Linear Shinkansen Station Delayed until 2031

JR Central has announced a 3-year, 9-month extension for the construction of the shuttle line connecting the Chubu General Rolling Stock Depot and the provisional Gifu Station in Nakatsugawa for the Linear Chuo Shinkansen. This means completion is now expected by December 2031. Importantly, this del...
by latestnews
24. Sep 2025, 00:28
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev: 31 of 84 Sections Miss 2027 Target
Replies: 1
Views: 116202

Re: [JP] JR Tokai Delays Tunnel Construction for Linear Shinkansen by Up to 5.5 Years

リニアのトンネル工事、3本の工期を延期 JR東海が発表 JR Tokai Delays Tunnel Construction for Linear Shinkansen by Up to 5.5 Years JR Tokai has announced that completion dates for five tunnel and bridge construction projects in Hayakawa and Fujikawa towns in Yamanashi Prefecture will be delayed by as much as 5½ years. Origi...
by latestnews
23. Sep 2025, 14:50
Forum: Russian Federation
Topic: [RU] St. Petersburg - Moscow
Replies: 12
Views: 14374

[RU] St. Petersburg - Moscow

Putin signs off on Europes largest ever high-speed rail project Quote: https://www.bignewsnetwork.com/news/278583136/putin-signs-off-on-europes-largest-ever-high-speed-rail-project Accessed 2025-09-23 Russia plans to build Europe’s largest high-speed rail network, spanning over 4,500 km (2,800 mile...
by latestnews
22. Sep 2025, 23:07
Forum: Conferences & Events
Topic: [JP] Tour of the Current Linear Chuo Shinkansen Tenryu River Section
Replies: 0
Views: 7400

[JP] Tour of the Current Linear Chuo Shinkansen Tenryu River Section

Linear Chuo Shinkansen Tenryu River Section Public Event JR Central will hold a walking event titled "Tour of the Current Linear Chuo Shinkansen Tenryu River Section!" The event will take place on Sunday, September 28, 2025. The starting and finishing point will be Motozenkoji Station. Re...
by latestnews
22. Sep 2025, 22:54
Forum: Shanghai Transrapid (EMS High Speed Maglev)
Topic: [CN] China Daily Newspaper: Future tech in the spotlight
Replies: 0
Views: 9668

[CN] China Daily Newspaper: Future tech in the spotlight

Future tech in the spotlight . Page_h[1].jpg https://mobile.chinadaily.com.cn/cn/resfile/2025-09-22/001/Page_h.jpg Accessed 2025-09-22 . 20250922_001_02_54864[1].png . Source: https://mobile.chinadaily.com.cn/cn/resfile/2025-09-22/001/20250922_001_02_54864.png Accessed 2025-09-22 Note: China Daily ...
by latestnews
19. Sep 2025, 13:15
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Kofu City Station debate
Replies: 10
Views: 87002

[JP] Kofu City Station Contractor Selected

Chuo Linear Shinkansen – Contractor Selected for Yamanashi Prefecture Station JR Central has signed a construction contract with a joint venture made up of three construction companies from Aichi, Tokyo, and Yamanashi for the Yamanashi Prefecture Station on the Chuo Linear Shinkansen. The planned Y...
by latestnews
18. Sep 2025, 15:04
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years
Replies: 11
Views: 99600

Re: [JP] Soft ground between Gifu and Nagoya delays Maglev by 5 years

Linear Chuo Shinkansen Tunnel Construction in Gifu Delayed by 5 Years Due to Softer Geology On September 18, JR Central announced that the construction timeline for three tunnels along the Linear Chuo Shinkansen route in Gifu Prefecture will be extended to between July and December 2031, a delay of...
by latestnews
18. Sep 2025, 14:48
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Construction of All Maglev Stations to Begin
Replies: 2
Views: 7405

[JP] Construction Begins on Maglev Station in Yamanashi

Construction Begins on Maglev Station in Yamanashi JR Central has announced the contractor for the construction of the new Linear Yamanashi Station, marking the official start of the project. This station, part of the Linear Chuo Shinkansen, will feature a unique design where a high-speed train sta...
by latestnews
17. Sep 2025, 23:10
Forum: Hyperloop concepts
Topic: Hardt Hyperloop
Replies: 2
Views: 27953

[NL] Hardt Hyperloop tested lane-switching in a vacuum tube

Hardt Hyperloop tested lane-switching in a vacuum tube Dutch Hyperloop firm Hardt Hyperloop has completed lane-changing within a vacuum tube successfully and validates the scalability of their technology and their eventual achievement of speeds of up to 700 km/h in the next few years. The trial occ...
by latestnews
12. Sep 2025, 14:55
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Compensation Measures for Ecosystem Impact of Maglev Construction
Replies: 2
Views: 15836

[JP] JR Central Proposes New Fix for Maglev Tunnel Water Problem

Gifu, Japan – JR Central Proposes New Fix for Maglev Tunnel Water Problem Central Japan Railway (JR Central) is proposing new measures to address groundwater problems at its Chuo Shinkansen maglev construction site in Mizunami, Gifu Prefecture, where water has been seeping from tunnels, drying up n...
by latestnews
10. Sep 2025, 22:17
Forum: Conferences & Events
Topic: [JP] Tokyo Shinagawa Transport Hub
Replies: 0
Views: 11127

[JP] Tokyo Shinagawa Transport Hub

NTT Urban Solutions announced that, in collaboration with scheme verge, it will conduct a demonstration experiment from October 11 to 13 that utilizes next-generation mobility and water transportation to connect the Shinagawa Konan area with the neighboring Tennozu and Odaiba areas. . 38582-101-062...
by latestnews
10. Sep 2025, 11:33
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Lida City and Maglev Station Implementation impact
Replies: 34
Views: 170969

[JP] Iida City Maglev Station Construction Costs

Iida City's Linear Station Plaza: Estimated Construction Cost of the "Large Roof" to be 250 Million Yen On September 9, Iida City revealed that the estimated construction cost for the first phase of the large wooden "roof" to be built at the Linear Central Shinkansen station (te...
by latestnews
9. Sep 2025, 22:19
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Next-Gen Material for Maglev Use
Replies: 1
Views: 8400

Re: [JP] Next-Gen Material for Maglev Infrastructure Use

World’s First Mass Production Technology for “Next-Generation Materials” on Linear Shinkansen JR Central announced the world’s first mass production technology for a new material that will replace low-magnetic steel rebar in the structure of the Linear Chuo Shinkansen. This innovation, the *Basalt ...
by latestnews
9. Sep 2025, 13:51
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Linear Maglev Extension Route: Kyoto or Nara?
Replies: 2
Views: 21776

[JP] Linear Maglev Extension Route via Nara?

Nara Group Calls for Early Completion of Entire Maglev Chuo Shinkansen Line At its 2025 annual meeting held on September 8 at Hotel Nikko Nara, the Nara Prefectural Promotion Alliance for the Maglev Chuo Shinkansen (chaired by Governor Makoto Yamashita) adopted a resolution urging the swift complet...
by latestnews
8. Sep 2025, 14:02
Forum: Germany
Topic: [DE] Dismantling of Transrapid Test Facility by 2034
Replies: 2
Views: 11032

Re: [DE] Dismantling of Transrapid Test Facility by 2034

Official Statement of the German Ministry (in German).

.
2101455[1].pdf
Deutscher Bundestag
(212.8 KiB) Downloaded 15 times
.

Source: https://dserver.bundestag.de/btd/21/014/2101455.pdf Accessed 2025-09-08
by latestnews
8. Sep 2025, 13:57
Forum: Germany
Topic: [DE] Dismantling of Transrapid Test Facility by 2034
Replies: 2
Views: 11032

[DE] Dismantling of Transrapid Test Facility by 2034

Germany Plans to Complete Dismantling of Transrapid Test Facility by 2034 The German federal government has confirmed that the dismantling of the Transrapid test facility in Emsland (TVE) is expected to be completed by 2034. Preparations for the deconstruction, along with accompanying measures, act...
by latestnews
8. Sep 2025, 13:14
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Next-Gen Material for Maglev Use
Replies: 1
Views: 8400

[JP] Next-Gen Material for Maglev Use

世界初! リニア向け“次世代材料”本格採用に道筋 JR東海が大量生産技術を確立 新幹線の橋にも活用 World First: JR Central Develops Mass Production Tech for Next-Gen Material for Maglev Use – Also to Be Used in Shinkansen Bridges JR Central has become the first in the world to develop mass production technology for basalt fiber-reinforced polymer...
by latestnews
2. Sep 2025, 23:35
Forum: Medium Speed (Ecobee)
Topic: [KR] Maglev Line Faces Uncertain Future Amid Dispute with Local Authorities
Replies: 1
Views: 11428

[KR] Maglev Line Faces Uncertain Future Amid Dispute with Local Authorities

Incheon Airport’s Maglev Line Faces Uncertain Future Amid Dispute with Local Authorities The Incheon International Airport Corporation (IIAC) is planning to repurpose the airport’s suspended Maglev train into a “tourist-oriented orbital line,” but progress has stalled due to ongoing conflicts with ...
by latestnews
2. Sep 2025, 11:56
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Bridge Construction Progressing in Yamanashi Prefecture
Replies: 1
Views: 14163

[JP] Linear Maglev River Bridges Rising in Yamanashi

山梨で進むリニア河川橋工事、橋上に上って見た眺め Linear Maglev River Bridges Rising in Yamanashi . 00[1].jpg . Photo: https://xtech.nikkei.com/atcl/nxt/column/18/00585/082600255/ Accessed Sept. 2, 2025 Major construction on the Chuo Linear Shinkansen continues across Yamanashi Prefecture. On August 5, 2025, the prefecture...
by latestnews
27. Aug 2025, 21:49
Forum: Websites, Web & Publications
Topic: [US] Baltimore - Washington Maglev: Call for support
Replies: 10
Views: 55355

[US] Baltimore - Washington high-speed maglev train project is not happening

Maryland’s high-speed maglev train project is not happening Baltimore Washington Rapid Rail is the company that had been slated to develop the project labeled Northeast Maglev. It said the train would have connected Washington, D.C., to Baltimore in 15 minutes at a speed of 311 mile per hour; and a...
by latestnews
27. Aug 2025, 21:45
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] Shizuoka Governor, Oi River Mayors Align on Maglev Compensation Policy

静岡知事と大井川流域首長、リニア工事後の補償担保方針で一致 Shizuoka Governor, Oi River Mayors Align on Maglev Compensation Policy Shizuoka Governor Yasutomo Suzuki and mayors from the Oi River basin met on August 27 to discuss the Chuo Shinkansen maglev project. The talks focused on compensation policies in the event of unfore...
by latestnews
24. Aug 2025, 21:54
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] The Shizuoka discussions are finally advancing

In Shizuoka Prefecture, where construction hasn’t yet begun, discussions are finally advancing. On August 1, JR Central requested to begin preparatory work (such as office setup and land development), which was previously blocked by former Governor Kawakatsu. Current Governor Suzuki remains cautious...
by latestnews
24. Aug 2025, 21:49
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Maglev Bridge Construction Progressing in Yamanashi Prefecture
Replies: 1
Views: 14163

[JP] Maglev Bridge Construction Progressing in Yamanashi Prefecture

Bridge Construction Progressing in Yamanashi Prefecture JR Central recently opened up construction sites in Yamanashi Prefecture to the media, showcasing progress on two major river-spanning bridges for the Linear Chuo Shinkansen: the Kamunashi River Bridge (754m, the longest on the Shinagawa–Nagoy...
by latestnews
21. Aug 2025, 14:33
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] JR Central to Begin Ravine Surveys in September

【リニア】JR東海が9月から沢上流域の調査へ 静岡県の専門部会で報告 県が求める15の沢が対象 JR Central to Begin Ravine Surveys in September – Reported at Shizuoka Prefecture Expert Committee JR Central told Shizuoka Prefecture’s expert committee that it will start surveys in upstream ravine areas in September. The prefecture requested invest...
by latestnews
21. Aug 2025, 11:32
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Government urged to complete Maglev construction as soon as possible
Replies: 32
Views: 172831

Re: [JP] Government urged to complete Maglev construction as soon as possible

リニア早期整備へ総会決議 愛知の期成同盟会 General Meeting Resolution for Early Construction of Linear Central Shinkansen Aichi Maglev Promotion League The Promotion Alliance, organized by local governments and the business community in Aichi Prefecture to promote the construction of the Linear Central Shinkansen, held...
by latestnews
20. Aug 2025, 12:53
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Compensation Measures for Ecosystem Impact of Maglev Construction
Replies: 2
Views: 15836

[JP] Compensation Measures for Ecosystem Impact of Maglev Construction

“リニア工事の生態系影響”JR東海が代償措置で新たな考え JR Central Presents New Compensation Measures for Ecosystem Impact of Maglev Construction On August 20, JR Central introduced a new approach to address potential ecological impacts from tunnel construction for the Chuo Shinkansen (Maglev) project in the Southern Alps. I...
by latestnews
19. Aug 2025, 21:46
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes
Replies: 3
Views: 70584

[JP] Shizuoka Signals Shift on Linear Maglev Work After Five-Year Dispute

Shizuoka Signals Shift on Linear Maglev Work After Five-Year Dispute The analysis of the dispute and its background was first detailed in a commentary by journalist Kazuya Kobayashi in PRESIDENT Online (https://news.nifty.com/article/magazine/12179-4404770/ Accessed 2025-08-19) . Kobayashi noted th...
by latestnews
18. Aug 2025, 13:47
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes
Replies: 3
Views: 70584

Re: [JP] Delays in Japan's (Chuo) Shinkansen Expansion Due to Technical Challenges and Local Disputes

Will the Long-Awaited Maglev Arrive in 10 Years? Population Growth and a Future Tourism Hub for Mt. Fuji—Yamanashi Still Without an Airport or Shinkansen Station . Progress on both the Chuo Shinkansen maglev line and the Hokkaido Shinkansen has stalled, and the Hokuriku Shinkansen extension to Shin...
by latestnews
17. Aug 2025, 17:58
Forum: ASIA
Topic: [PH] Maglev for the Philippines?
Replies: 1
Views: 76903

[PH] [KR] Langkawi Maglev Project Halted Following Withdrawal of Korean Partner

Langkawi Maglev Project Halted Following Withdrawal of Korean Partner The proposed high-speed magnetic levitation (maglev) rail project in Langkawi has been suspended following the withdrawal of the Korean investor involved in the initiative. According to Haim Hilman Abdullah, Kedah State Executive...
by latestnews
17. Aug 2025, 13:02
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: Arsenic substances in soil in Gifu 2.1 times the environmental standard
Replies: 16
Views: 98870

[JP] Chemical Injection Abandoned in Gifu Tunnel Project Over Groundwater and Structural Concerns

Discontinuation of Chemical Grouting to Control Groundwater Inflow at Gifu Linear Chuo Shinkansen Tunnel Construction Site On June 3, 2025, Central Japan Railway Company (JR Central) announced the cessation of chemical grouting operations intended to reduce groundwater inflow within the Linear Chuo...
by latestnews
13. Aug 2025, 22:58
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] JR Central Seeks Understanding for Worksite Expansion at Water Resource Conference

JR Central Seeks Understanding for Worksite Expansion at Water Resource Conference . Screenshot 2025-08-13 225643.jpg Photo: Screenshot from https://www.yomiuri.co.jp/local/shizuoka/news/20250813-OYTNT50177/ Accessed: August 13, 2025 . On August 13, the Oigawa Water Resource Related Council meeting...
by latestnews
13. Aug 2025, 17:22
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] The Shizuoka Water & Maglev Tunnel Problem
Replies: 258
Views: 3942280

[JP] JR Central Explains Water Outflow Measures for Linear Construction in Shizuoka to Local Authorities

JR Central Explains Water Outflow Measures for Linear Construction in Shizuoka to Local Authorities On August 13, the Oi River Water Resource Liaison Council—comprising Shizuoka Prefecture and municipalities along the Oi River—held its first meeting in two and a half months in Fujieda City to discu...
by latestnews
7. Aug 2025, 10:09
Forum: Fundamental issues relating to mobility, transport and Maglev
Topic: [CN] Maglev train researchers may have solved ‘tunnel boom’ shock waves
Replies: 1
Views: 34589

[CN] Maglev train researchers may have solved ‘tunnel boom’ shock waves

Maglev train researchers may have solved ‘tunnel boom’ shock waves Soundproofing buffers to be deployed on China’s latest maglev prototype Chinese researchers may have resolved the long-standing “tunnel boom” issue as the country prepares to introduce its newest high-speed maglev train prototype. C...
by latestnews
4. Aug 2025, 22:19
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
Replies: 6
Views: 78091

[JP] Exemption from Embankment Regulations?

Exemption from Embankment Regulations for Linear Waste Disposal Site, Shizuoka Prefecture's Initial Recognition in Expert Subcommittee On August 4, a subcommittee in Shizuoka Prefecture, discussing the impact of the Southern Alps tunnel construction for the Linear Chuo Shinkansen on the water resou...
by latestnews
4. Aug 2025, 22:15
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction
Replies: 6
Views: 78091

[JP] Improper Handling of Excavated Soil in Yamanashi Maglev Tunnel Construction

Exemption from Embankment Regulations for Linear Waste Disposal Site, Shizuoka Prefecture's Initial Recognition in Expert Subcommittee On August 4, a subcommittee in Shizuoka Prefecture, discussing the impact of the Southern Alps tunnel construction for the Linear Chuo Shinkansen on the water resour...
by latestnews
4. Aug 2025, 13:02
Forum: Chuo Maglev Shinkansen (Tokyo - Nagoya - Osaka)
Topic: [JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site
Replies: 2
Views: 68745

[JP] 7,000 Liters of Contaminated Water Leak from Maglev Construction Site

. On July 17, at the construction site of the Linear Chuo Shinkansen’s South Alps Tunnel in Hayakawa Town, contaminated water overflowed from a storage tank and leaked into a nearby river. The tank had been collecting rainwater that came into contact with excavated soil. An estimated 7 cubic meters ...
by latestnews
2. Aug 2025, 22:02
Forum: USA: Baltimore - Washington Maglev Project
Topic: [US] Trump administration cancels Maglev funding
Replies: 3
Views: 25892

Re: [US] Trump administration cancels Maglev funding

Baltimore Washington Rapid Rail is the company that had been slated to develop the project labeled Northeast Maglev. It said the train would have connected Washington, D.C., to Baltimore in 15 minutes at a speed of 311 mile per hour; and a trip between Washington and New York in an hour. The compan...